2057
|
Monday, February 03, 2020, 09:14 |
David Wang | ITW | Standard Operation | TM4 | UCx 29 | TM4 UCx 29 disconnection checklist | TM4 has been disconnected in ITW. See attachment
checklist. |
|
2011
|
Wednesday, October 23, 2019, 06:56 |
David Wang | ITW | Standard Operation | TM4 | UCX 28 | TM4 UCx 28 disconnection checklist | TM4 was disconnected in ITW. See
checklist. |
|
2151
|
Tuesday, September 29, 2020, 14:28 |
David Wang | South Hot-Cell | Standard Operation | TM4 | UC#31 | TM4 UC#31 Electrical check and HS leak check | Tm4 UCx 31# electrical check result. See
attachment. |
|
1737
|
Thursday, June 14, 2018, 11:37 |
David Wang | ITE | Standard Operation | TM4 | UC#22 | TM4 UC 22# checklist. | See attachments |
|
8
|
Tuesday, July 19, 2011, 12:25 |
maicodallavalle | South Hot-Cell | Standard Operation | TM4 | Ta36 | TM4 Ta36 Target was put into the south hot cell. | Ta36 was check by Maico and Chad.It was
then carried into the anteroom.From the anteroom
it was transferred into the south hot cell. |
|
2233
|
Thursday, July 08, 2021, 11:45 |
David Wang | South Hot-Cell | Standard Operation | TM4 | Ta#62 | TM4 Ta#62 leak check and lectrical check result at SHC and TCS. | At SHC: HS line no leak . electrical check
result is fine. At TCS: helium pressurized
HS line to 70psi, 3 minutes. LD leak |
|
9
|
Tuesday, July 19, 2011, 13:51 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | Ta#36 | TM4 Ta#36 Leak Check Results | Tm4 w/ Ta#36 has been vacuum leak checked
using the standard leak check procedure.
At 1:45pm RH was contacted to notify |
|
1778
|
Friday, September 07, 2018, 10:47 |
David Wang | ITE | Repair | TM4 | UCx24 | TM4 TP2 replacement | TM4 TP2 could not be started after
module was connected back to ITE on Sep 04th.
It was replaced with a new pump on Sep 05th. |
|
1541
|
Thursday, May 18, 2017, 10:08 |
David Wang | Conditioning Station | Standard Operation | TM4 | | TM4 TP1 at TCS | TM4 TP1 was found making some noise during
operation this morning. The current draw
was check then. It was 1.8 A which is higher |
|
1545
|
Friday, May 19, 2017, 13:49 |
David Wang | Conditioning Station | Repair | TM4 | | TM4 TP1 at TCS | TM4 TP1 is replaced. TCS and TM4 was argon
vented before the job.The job took about
30minutes. I started the all turbo |
|
358
|
Thursday, May 23, 2013, 11:14 |
David Wang | South Hot-Cell | Standard Operation | TM4 | TA#40 | TM4 TA# 40 HS leak check at SHC | TM4 Ta#40 HS leak check is done at SHC
. No leak has been found so far. There will
be a helium pressure test on it at |
|
1460
|
Thursday, March 23, 2017, 11:42 |
David Wang | Conditioning Station | Maintenance | TM4 | | TM4 Sevice cap rust are cleaned out. | TM4 service cap rust are cleaned out at
TCS. All top surface of TM4 are wiped and
cleaned . The module looks good now. see |
|
2245
|
Friday, September 17, 2021, 12:20 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | Sic#41 | TM4 SIS with Target and No external Connections | TM4 electric check with new target
was done by David. A pic attached here for
ref. |
|
2275
|
Wednesday, November 24, 2021, 07:17 |
Frank Song | South Hot-Cell | Standard Operation | TM4 | Ta #63 | TM4 SIS with Target and No external Connections | the TM4 with new target Ta #63 installed
in SHC and an electric check was made by
David. |
|
2282
|
Wednesday, January 05, 2022, 09:38 |
Frank Song | ITE | Maintenance | TM4 | Ta #63 | TM4 SIS with Target and No external Connections | electric check done in ITE. |
|
2292
|
Tuesday, January 18, 2022, 11:02 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | Ta #63 | TM4 SIS with Target and No external Connections | David made an electric check after
TM4 been moved to NHC from ITE. The target
is still on the module. Please find out attached |
|
2089
|
Wednesday, March 18, 2020, 10:40 |
David Wang | ITE | Development | TM4 | | TM4 P2N target connection checklist. | TM4 has been connected in ITE. See checklist. |
|
1736
|
Tuesday, June 12, 2018, 11:26 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM4 Optics Tray | I have "slung" the TM4 optics
tray in preparation for its removal. |
|
172
|
Friday, September 07, 2012, 08:54 |
David Wang | Conditioning Station | Standard Operation | TM4 | NiO #1 | TM4 NiO #1 target heat shield helium pressure check is done. | leak detector pumped down to 0.0xE-9 atm.cc/sec,
and 0.0xE-4 torr. All high vacuum gauge readings
at CS and TM4 are at low -6 range from 2.2xE-6torr |
|
2395
|
Tuesday, November 29, 2022, 11:03 |
Adam Newsome | ITE | Standard Operation | TM4 | C#4 | TM4 Move - TCS to ITE | TM4 was moved from the Conditioning Station
to the East Target Station with C#4. |
|