1515
|
Monday, May 01, 2017, 08:53 |
chad fisher | South Hot-Cell | Repair | TM3 | | Fiberglass removal | Fiberglass, capton tape and tie straps
have been removed from TM3. |
|
1517
|
Monday, May 01, 2017, 13:11 |
David Wang | South Hot-Cell | Repair | TM3 | | Electrical Check on TM3 after fibergalss is moved in SHC. | RU( coil 1), F (anode), and 60kv bias(HS,
Gasline, and MSP) are shorted together.
Other lines are good. They are measured |
|
1520
|
Tuesday, May 02, 2017, 18:33 |
Aurelia Laxdal | South Hot-Cell | Repair | TM3 | no target | TM3 HV tests at atmosphere for Each Line(s) after the Fiber Glass removal May 2, 2017 | Today a HV test at atmosphere was performed
for Each Line(s), while floating the other
lines. THIS TEST AT ATMOSPHERE IS THE FIRST |
|
1532
|
Wednesday, May 10, 2017, 14:00 |
Anders Mjos | South Hot-Cell | Development | | ITE-Ta-LP-FEBIAD | Test target examination | Chad and Anders inspected the test target
in the hot cell today. The lid had been previously
removed. |
|
1535
|
Tuesday, May 16, 2017, 10:28 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#19 | module moved | TM#4 with UC#19 has been moved from ITE
to the south hot cell. |
|
1536
|
Tuesday, May 16, 2017, 13:23 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | UC#20 | UC#20 Installed | UCx#19 has been removed from TM4 and UCx#20
installed.
UCx#19 still had water in it at pressure |
|
1537
|
Tuesday, May 16, 2017, 14:18 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#20 | Electrical Check | TM#4 with UC#20 has had the electrical
check done on it at the south hot cell,
see attached for details |
|
1539
|
Wednesday, May 17, 2017, 08:31 |
David Wang | South Hot-Cell | Standard Operation | TM4 | | Leak check on TM4 HS line at SHC | Chad and I finished leak check on HS line
with UCx target installed on it. Base
Leak rate:0.0X 10^-9 atm.cc/sec, Base pressure |
|
1550
|
Tuesday, June 06, 2017, 13:42 |
chad fisher | South Hot-Cell | Standard Operation | TM2 | SiC#36 | Ta#51 removed SiC#36 installed | This afternoon Ta#51 was removed from TM2
and SiC#36 installed.
All new fasteners used. High current |
|
1562
|
Thursday, June 22, 2017, 11:10 |
chad fisher | South Hot-Cell | Maintenance | | | In cell airline | The in cell airline has preemptively been
replaced. The hose was, as far as I know
the original. |
|
1565
|
Monday, June 26, 2017, 11:42 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#20 | Module move | TM#4 with UC#20 has been moved from
the east target station to the south hot
cell. Also the shield plug was remotely installed |
|
1566
|
Monday, June 26, 2017, 11:47 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | Ta#52 | UC#20 Removed Ta#52 installed | UC#20 has been removed from TM4 and put
in a bucket back-filled with argon. Ta#52
has been installed onto TM4 with new fasteners. |
|
1568
|
Tuesday, June 27, 2017, 10:26 |
David Wang | South Hot-Cell | Standard Operation | TM4 | Ta#52 | Leak check on TM4 HS line at SHC | LD base LR:0.0Xe-9 atm.cc/sec. No leak
has been found during the check. The
HS line will be helium pressurized at TCS |
|
1573
|
Thursday, June 29, 2017, 11:12 |
Anders Mjos | South Hot-Cell | Standard Operation | TM4 | UC#20 | Post Irradiation Examination (PIE) | The target was inspected by Chad and Anders.
Photos are available on DocuShare.
It was noticed that the target tube heater |
|
1589
|
Tuesday, August 01, 2017, 14:39 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | SiC#36 | Electrical Check | The electrical check of TM#2 with SiC#36
attached. Post beam at the south hot cell.
See attached results allow the before beam |
|
1591
|
Wednesday, August 02, 2017, 15:13 |
David Wang | South Hot-Cell | Standard Operation | TM2 | | SHC, TM2 leak check on HS line. | HS line is leak checked at SHC this afternoon
by helium spay. Leak detector base
LR 0.0 XE-9atm.cc/sec. Base pressure 0.0Xe-4 |
|
1597
|
Tuesday, August 15, 2017, 09:27 |
Anders Mjos | South Hot-Cell | Standard Operation | TM2 | SiC#36 | Electrical Check of target in SHC |
|
|
1603
|
Monday, August 28, 2017, 12:07 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | UCx#21 | Ta#52 removed UCx#21 installed | Ta#52 has been removed from TM$ and UCx#21
installed with new mounting and high current
hardware. High current fasteners torqued |
|
1605
|
Monday, August 28, 2017, 14:40 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#21 | Electrical Check | The results of the electrical check of
TM#4 with UC#21 attached. |
|
1617
|
Tuesday, September 19, 2017, 10:40 |
chad fisher | South Hot-Cell | Maintenance | | | South East Manipulator Maintenence | Entered hot cell to preform replacement
of slave tong cable. Existing cable shows
no signs of wear so it has been re-installed. |
|