Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1517     Entry time: Monday, May 01, 2017, 13:11
Author: David Wang 
Category: South Hot-Cell 
Type: Repair 
Module: TM3 
Target/Number:  
Subject: Electrical Check on TM3 after fibergalss is moved in SHC.  

RU( coil 1), F (anode), and 60kv bias(HS, Gasline, and MSP)  are shorted together. Other lines are good.  They are measured between  individual line each other  @500V. The megga showed OL. All of  them to ground are OL @500V as well. EL is grounded during check.

ELOG V2.9.2-2455