Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1550     Entry time: Tuesday, June 06, 2017, 13:42
Author: chad fisher 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM2 
Target/Number: SiC#36 
Subject: Ta#51 removed SiC#36 installed 

This afternoon Ta#51 was removed from TM2 and SiC#36 installed.

All new fasteners used. High current fasteners torqued to 130 in lbs.

 

 

ELOG V2.9.2-2455