  RH-ISAC, Page 36 of 140  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
Entry  Friday, January 18, 2013, 11:17, David Wang, South Hot-Cell, Standard Operation, TM4, dummy target, TM4 heat shield circuit leak check with dummy target on. 

Chad and i did a leak check on TM4 heat shield circuit with installed dummy target at SHC today. The leak detector is pumped to 0.0xE-9atm.cc/sec.Chad sprayed helium twice on each  VCR joints .There is no any response had been found on the leak detector during each 45 seconds waiting time. The TM4 heat shield circuit with dummy  target is leak tight so far.  

Entry  Tuesday, September 04, 2012, 14:34, David Wang, South Hot-Cell, Standard Operation, TM4, NiO #1, TM4 heat shield circuit leak check with NiO#1 target 

Chad and i did a leak check on TM4 heat shield circuit with new NiO#1 target installed. It took about 40 mins(much longer than usual) to pump down the circuit to leak rate 0.6x E-9atm.cc/sec and 0.0x E-4 torr o leak detector.

All vacuum lines and joints which connected to the leak detector had been helium sprayed and they are leak  tight.Chad sprayed helium on each VCR joints for 2 seconds every time. During 1min waiting time, there is no any response on leak detector. Chad repeated same test again for double checking and we got same result. Chad finally flushed the helium around the target heat shield for 10 seconds.we waited for 1minute and found no response on the leak detector. The heat shield circuit is leak tight at this stage. I will do a helium pressure test on this circuit when TM4 is in CS and under vacuum.

Entry  Wednesday, March 27, 2013, 12:08, David Wang, South Hot-Cell, Standard Operation, TM4, Sic LIS-RFQ, TM4 heat shield circuit leak check with SiC LIS-RFQ target 

Chad and I did the TM4 heat shield leak check yesterday at SHC. The leak detector was pumped to 4.6 xE-9atm.cc/sec, and 0.0xE-4 torr after 1.5 hours pumping. Chad sprayed helium twice on both VCR fittings. There is no response had been found during each 45 seconds waiting time. Since the module moved to ITE directly,we didnt have helium pressure test this time. I  would say thee heat shield circuit is leak tight. so far.

Entry  Monday, April 27, 2015, 10:28, David Wang, Conditioning Station, Standard Operation, TM1, UCx12, TM4 has been partially disconnected at CS. 

TM1 has been partially disconnected at CS for tomorrow move. The CS TP1S is still running and will be stopped and disconnected tomorrow morning.

Entry  Tuesday, November 08, 2016, 14:45, David Wang, ITE, Maintenance, TM4, , TM4 has been moved to ITE and connected there. 

All ITE and TM4  turbo pumps are started. The east station pumping down is good so far.

Entry  Tuesday, July 16, 2024, 11:15, David Wang, ITW, Standard Operation, TM4, TiC #7 febiad. , TM4 has been moved from TCS to ITW.  

TM4 has been moved from TCS to ITW.  the move is smooth.

Entry  Tuesday, July 16, 2024, 11:15, David Wang, ITW, Standard Operation, TM4, TiC #7 febiad. , TM4 has been moved from TCS to ITW.  

TM4 has been moved from TCS to ITW.  the move is smooth.

Entry  Tuesday, September 17, 2024, 11:16, David Wang, ITW, Standard Operation, TM4, TiC#9, TM4 has been moved from TCS to ITW. 

TM4 has been moved from TCS to ITW. The move is smooth.

Entry  Friday, April 26, 2024, 13:22, David Wang, South Hot-Cell, Standard Operation, TM4, , TM4 has been moved from SMP to SHC. 

TM4 has been moved from SMP to SHC. Adam and I did the move. the move is smooth.

Entry  Friday, August 16, 2024, 09:50, David Wang, South Hot-Cell, Standard Operation, TM4, TiC #7 febiad., TM4 has been moved from SMP to SHC. 

TM4 has been moved from  SMP to SHC. The move is smooth.

 

Entry  Friday, September 06, 2024, 10:01, David Wang, South Hot-Cell, Standard Operation, TM4, Ta#67 back up. , TM4 has been moved from SMP to SHC. 

TM4 has been moved from SMP to SHC. The move is smooth.

Entry  Wednesday, May 22, 2024, 12:32, David Wang, South Hot-Cell, Standard Operation, TM4, UCx#45, TM4 has been moved from SHC to TCS. 

TM4 has been moved from SHC to TCS. the move is smooth.

Entry  Monday, July 08, 2024, 10:40, David Wang, Conditioning Station, Standard Operation, TM4, TiC#7, TM4 has been moved from SHC to TCS. 

TM4 has been moved from SHC to TCS. The move is successfully.

Entry  Monday, August 19, 2024, 09:32, David Wang, Conditioning Station, Standard Operation, TM4, Ta#68 , TM4 has been moved from SHC to TCS. 

TM4 has been moved from SHC to TCS. The move is successful.

Entry  Wednesday, September 11, 2024, 07:59, David Wang, Conditioning Station, Standard Operation, TM4, TiC#9, TM4 has been moved from SHC to TCS. 

TM4 has been moved from SHC to TCS. The move is smooth.

Entry  Monday, April 29, 2024, 14:21, David Wang, ITE/ITW, Standard Operation, TM4, , TM4 has been moved from SHC to ITW. 

TM4 has been moved from SHC to ITW. Peter did the move. Travis helped on him.   The move is successful.

Entry  Tuesday, June 07, 2016, 11:37, David Wang, ITE, Standard Operation, TM4, Ta#47, TM4 has been moved from ITE to SHC 

Bill and Yasmine did the move. Everything is good.

Entry  Friday, September 23, 2016, 07:49, David Wang, Conditioning Station, Standard Operation, TM4, , TM4 has been moved and connected at TCS 

All TCS and TM4 turbo-pumps were started yesterday. Overnight pumping down is good so far.

Entry  Tuesday, January 24, 2023, 08:46, David Wang, ITE, Standard Operation, TM4, UCx#41, TM4 has been disconnected in ITE.  UCx#41_TM4_disconnection_checklist_in_ITE.pdf

TM 4 has been disconnected in ITE.  See attachment for disconnection checklist.

Entry  Tuesday, July 16, 2013, 13:09, David Wang, ITE, Standard Operation, TM4, , TM4 has been disconnected in ITE. 

TM4 has been disconnected in ITE. All water lines on TM4 have been purged. ITE is venting now.