Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1396     Entry time: Tuesday, November 08, 2016, 14:45
Author: David Wang 
Category: ITE 
Type: Maintenance 
Module: TM4 
Target/Number:  
Subject: TM4 has been moved to ITE and connected there. 

All ITE and TM4  turbo pumps are started. The east station pumping down is good so far.

ELOG V2.9.2-2455