Message ID: 112     Entry time: Tuesday, May 22, 2012, 15:19
Author: David Wang 
Category: ITE 
Type: Standard Operation 
Module: TM4 
Target/Number: sic 27 
Subject: TM4 in ITE under pumping 

  I started 6 turbo pumps this afternoon. The TM4 and ITE are under pumping now. The vacuum is fine so far. We will see a better picture tomorrow morning. In order to keep the system pressure at 90 psi, I just turned on all the water to TM4 circuits. The water interlock check which related to TM4 water circuits is all done. I will do the rest part (XTpage related to 2A beam) next week once I turn on all the water to ITE. The ITE and TM4 will be ready for HV conditioning once the vacuum is ok.

                    