Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2570     Entry time: Friday, April 26, 2024, 13:22
Author: David Wang 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM4 
Target/Number:  
Subject: TM4 has been moved from SMP to SHC. 

TM4 has been moved from SMP to SHC. Adam and I did the move. the move is smooth.

ELOG V2.9.2-2455