  1302   Wednesday, August 03, 2016, 09:49 David WangConditioning StationStandard OperationTM4 TM4 is ready for conditioing at TCS.I started TCS water system and installed
HV cover onto TM4.  The TM4 containment
box is supplied with water also. TM4 is ready
  
  1967   Friday, August 16, 2019, 08:52 David WangConditioning StationStandard OperationTM4 TM4 is moved from TCS to SW silo.TM4 is moved from TCS to SW silo this morning.
The move is good. 
  
  732   Monday, August 11, 2014, 14:30 David WangITEStandard OperationTM4UCx #10TM4 is connected in ITE.TM4 is connected in ITE. All ITE 
turbo pumps are started. I will check the
pumping down process tomorrow morning. Everything
  
  797   Thursday, November 20, 2014, 14:12 David WangITEStandard OperationTM4UCx11TM4 is connected in ITE.TM4 has been connected connect in ITE.
Water is supplied to TM4 module only.
  
  727   Thursday, August 07, 2014, 17:07 David WangConditioning StationStandard OperationTM4UCx #10TM4 is connected in CS.TM4 is connected at CS. All turbo pumps
are started. The pumping down is good so
far.
  
  876   Friday, March 27, 2015, 11:29 David WangConditioning StationStandard OperationTM4Ta#45TM4 is connected at CSTM4 has been connected at CS which includes
high current cables, water lines, EE cable,
and Enizel lens cable. The HV cover has been 
 010.JPG013.JPG012.JPG 
  932   Wednesday, June 03, 2015, 13:51 David WangConditioning StationStandard OperationTM4SiC #31TM4 is connected at CSTM4 has been connected at CS. CS HV cover
is installed.I made a pair of new cooling
lines for TM window cooling at CS. The TM4
 007.JPG009.JPG008.JPG010.JPG 
  112   Tuesday, May 22, 2012, 15:19 David WangITEStandard OperationTM4sic 27TM4 in ITE under pumping

Normal
0





  
  196   Tuesday, October 16, 2012, 07:14 David WangConditioning StationStandard OperationTM4UCX#5TM4 heat shield helium pressure test and electrical check at CSTM4 heat shield helium pressure test and
electrical check were done  at CS 
last week. The results are good. NO leak
  
  237   Friday, January 18, 2013, 11:17 David WangSouth Hot-CellStandard OperationTM4dummy targetTM4 heat shield circuit leak check with dummy target on.Chad and i did a leak check on TM4 heat
shield circuit with installed dummy target
at SHC today. The leak detector is pumped
  
  168   Tuesday, September 04, 2012, 14:34 David WangSouth Hot-CellStandard OperationTM4NiO #1TM4 heat shield circuit leak check with NiO#1 targetChad and i did a leak check on TM4 heat
shield circuit with new NiO#1 target installed.
It took about 40 mins(much longer than usual)
  
  281   Wednesday, March 27, 2013, 12:08 David WangSouth Hot-CellStandard OperationTM4Sic LIS-RFQTM4 heat shield circuit leak check with SiC LIS-RFQ targetChad and I did the TM4 heat shield leak
check yesterday at SHC. The leak detector
was pumped to 4.6 xE-9atm.cc/sec, and 0.0xE-4
  
  898   Monday, April 27, 2015, 10:28 David WangConditioning StationStandard OperationTM1UCx12TM4 has been partially disconnected at CS.TM1 has been partially disconnected at
CS for tomorrow move. The CS TP1S is still
running and will be stopped and disconnected
  
  1396   Tuesday, November 08, 2016, 14:45 David WangITEMaintenanceTM4 TM4 has been moved to ITE and connected there.All ITE and TM4  turbo pumps are started.
The east station pumping down is good so
far.
  
  2640   Tuesday, July 16, 2024, 11:15 David WangITWStandard OperationTM4TiC #7 febiad. TM4 has been moved from TCS to ITW. TM4 has been moved from TCS to ITW. 
the move is smooth. 
  
  2641   Tuesday, July 16, 2024, 11:15 David WangITWStandard OperationTM4TiC #7 febiad. TM4 has been moved from TCS to ITW. TM4 has been moved from TCS to ITW. 
the move is smooth.
  
  2683   Tuesday, September 17, 2024, 11:16 David WangITWStandard OperationTM4TiC#9TM4 has been moved from TCS to ITW.TM4 has been moved from TCS to ITW. The
move is smooth.
  
  2570   Friday, April 26, 2024, 13:22 David WangSouth Hot-CellStandard OperationTM4 TM4 has been moved from SMP to SHC.TM4 has been moved from SMP to SHC. Adam
and I did the move. the move is smooth. 
  
  2661   Friday, August 16, 2024, 09:50 David WangSouth Hot-CellStandard OperationTM4TiC #7 febiad.TM4 has been moved from SMP to SHC.TM4 has been moved from  SMP to SHC.
The move is smooth.
 
  
  2674   Friday, September 06, 2024, 10:01 David WangSouth Hot-CellStandard OperationTM4Ta#67 back up. TM4 has been moved from SMP to SHC.TM4 has been moved from SMP to SHC. The
move is smooth. 
  