Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1034     Entry time: Thursday, August 13, 2015, 11:34
Author: Travis Cave 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM2 
Target/Number: Dummy Target 
Subject: Electrical Check 

Electrical check of TM2 without target after that widget has installed, electrical check with the shunts on, electrical check with the dummy target installed.

Attachment 1: TM2_elechknotgtafterwidget.PDF  157 kB  | Show | Hide all
Attachment 2: TM2_elechknotgtshunt.PDF  76 kB  | Show | Hide all
Attachment 3: TM2_elecchkdummytgt.PDF  159 kB  | Show | Hide all
ELOG V2.9.2-2455