ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
Text |
|
|
2438
|
Thursday, May 04, 2023, 07:14 |
David Wang | Safe Module Parking | Standard Operation | TM4 | | SMP vacuum pumpimg down is stopped. | SMP vacuum pumping down is stopped.
SMP and TM4 venting to atmosphere will be
started soon. |
|
|
2439
|
Monday, May 08, 2023, 10:59 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | TiC#5 | electrical check/leak check | TM4 with target TiC#5 installed has
been leak checked and electric checked on
NHC. |
|
|
2440
|
Wednesday, May 10, 2023, 08:40 |
Frank Song | ITE | Standard Operation | TM4 | TiC#5 | Module Connection | TM4 was connected in ITE. pics
attached FYI. |
|
|
2443
|
Monday, May 22, 2023, 15:06 |
Carla Babcock | ITE | Standard Operation | TM4 | TiC#5 | Module conditioning | Yesterday and today module conditioning
was done on Tm4 in ITE. This is the first
ramp up after the shutdown and ITE is planned |
|
|
2445
|
Wednesday, May 24, 2023, 17:25 |
Carla Babcock | ITE | Repair | TM4 | TiC#5 | Issues with anode short | When I tried to raise the anode voltage
in cathode bias mode on May 23 evening, I
found the target or tube shorted to HV common. |
|
|
2448
|
Tuesday, May 30, 2023, 12:23 |
Frank Song | ITE | Standard Operation | TM4 | TiC#5 | gas lines pump out in ITE Faraday Cage | argon is being supplied at 6 psi to TM4. |
|
|
2455
|
Tuesday, June 13, 2023, 09:55 |
Frank Song | ITE | Standard Operation | TM4 | TiC#5 | module disconnection | TM4 with TiC#5 was disconnected in
ITE and moved to NHC. |
|
|
2456
|
Tuesday, June 13, 2023, 11:45 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | TiC#5 | electrical check | TM4 with spent target TiC#5 electric
check after moving from ITE to NHC. |
|
|
2457
|
Tuesday, June 13, 2023, 11:49 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | SiC#45 | electrical check and leak check | TM4 with new target SiC#45 installed
has been leak checked and electrical checked
on top of NHC. |
|
|
2458
|
Wednesday, June 14, 2023, 07:10 |
Frank Song | ITE | Standard Operation | TM4 | SiC#45 | TM4 with SiC#45 connection in ITE | TM4 with new target SiC#45 was connected
in ITE, all TPs are running at their full
speed. |
|
|
2459
|
Wednesday, June 14, 2023, 13:37 |
David Wang | ITE | Standard Operation | TM4 | | ITE water signal interlock check | ITE water signal interlock check including
HS,EE, TA, TU, MSP. Coil1 , C-window ,2a-window,
2A tank, 2A shielding plug , 2A dump, 2A |
|
|
2464
|
Tuesday, July 18, 2023, 10:08 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | SiC#45 | module disconnection & electrical check right after transferred from ITE to NHC | TM4 with spent target SiC#45 was
disconnected ITE and an electrical
check made right after moved on NHC. |
|
|
2465
|
Wednesday, July 19, 2023, 08:04 |
Frank Song | ITE | Standard Operation | TM4 | UCx#42 | Module Connection | TM4 with new target UCx#42 was connected
in ITE. |
|
|
2466
|
Wednesday, July 19, 2023, 08:09 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | UCx#42 | electrical check | An electrical check was made after
new target installed on TM4. |
|
|
2483
|
Tuesday, August 29, 2023, 09:33 |
Frank Song | ITE | Standard Operation | TM4 | UCx#42 | module disconnection | TM4 with spent target UCx#42 was
disconnected in ITE and has been remote moved
to NHC this morning. |
|
|
2484
|
Tuesday, August 29, 2023, 10:45 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | UCx#42 | electrical check | TM4 with spent target UCx#42
has been electric checked at NHCpost right
after transferred from ITE. |
|
|
2485
|
Tuesday, August 29, 2023, 14:32 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | Ta#65 | electrical check/leak check | TM4 with new target Ta#65 has been
E/L checked at NHCPost. |
|
|
2486
|
Tuesday, August 29, 2023, 14:32 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | Ta#65 | electrical check/leak check | TM4 with new target Ta#65 has been
E/L checked at NHCPost. |
|
|
2488
|
Wednesday, September 06, 2023, 08:07 |
Frank Song | ITE | Standard Operation | TM4 | Ta#65 | Module Connection | TM4 was connected in ITE with new
target Ta#65 installed. see attachment in
detail. |
|
|
2498
|
Tuesday, November 07, 2023, 13:42 |
Frank Song | South Hot-Cell | Standard Operation | TM4 | Ta#65 | electrical check with the spent target | TM4 with spent target Ta#65 was electrical
checked right after being moved to SHC. |
|