Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
RH-ISAC
Not logged in
List
Message ID:
2455
Entry time:
Tuesday, June 13, 2023, 09:55
Author:
Frank Song
Category:
ITE
Type:
Standard Operation
Module:
TM4
Target/Number:
TiC#5
Subject:
module disconnection
TM4 with TiC#5 was disconnected in ITE and moved to NHC.
Attachment 1:
TM4_with_TiC#5_(FEBIAD)disconnected_in_ITE_20230613.pdf
138 kB
|
Show
|
Hide all
ELOG V2.9.2-2455