2642
|
Tuesday, July 16, 2024, 13:14 |
Frank Song | ITW | Standard Operation | TM4 | TiC#7 | Module Connection | TM4 with TiC#7 was connected in ITW,
all TPs are running at full speed. |
 |
|
2649
|
Friday, August 09, 2024, 08:11 |
Frank Song | ITW | Standard Operation | TM4 | TiC#7 | module disconnection | TM4 with spent target TiC#7 (dead)
was disconnected in ITW and ready to move
to TCS. |
|
|
2651
|
Friday, August 09, 2024, 18:18 |
David Wang | ITW | Standard Operation | TM4 | TiC#7 | Tm4 has been moved from ITW to SMP. | Tm4 has been moved from ITW to SMP. the
move is successful. |
|
|
2667
|
Tuesday, August 20, 2024, 11:36 |
Carla Babcock | South Hot-Cell | Standard Operation | | TiC#7 | TiC#7 PIE | TiC#7 failed after two weeks of operations
- measurements in the electrical room indicated
that the negative side of the CHT was broken |
|
|
2669
|
Wednesday, August 21, 2024, 10:53 |
Travis Cave | Spent Target Vault | Standard Operation | | TiC#7 | Spent Target Move | TIC#7 was placed in pail #294 and
then moved from the south hot cell to the
spent target vault spot 4B. It was 82.3mSv/hr |
|
|
2442
|
Friday, May 19, 2023, 09:39 |
Frank Song | South Hot-Cell | Standard Operation | TM2 | TiC#6 | leak/electrical check | TM2 with TiC#6 was checked on SHC,
see pic attached pls. |
|
|
2444
|
Wednesday, May 24, 2023, 08:34 |
David Wang | Conditioning Station | Standard Operation | TM2 | TiC#6 | TM2 HS line helium pressure check and gasline fittins leak check. | TM2 HS line helium leak check is done.
leak detector base LR 1.8xE-8atm.cc/sec.
helium pressure 70 psi. 5 minutes test. no |
|
|
2447
|
Monday, May 29, 2023, 12:52 |
Frank Song | ITW | Standard Operation | TM2 | TiC#6 | Module Connection | TM2 with TiC#6 was connected in ITW
(FEBIAD), turbo pumps were started successfully. |
|
|
2449
|
Tuesday, May 30, 2023, 12:30 |
Frank Song | ITW | Standard Operation | TM2 | TiC#6 | gas lines pump out in ITW Faraday Cage | Gas lines pumped |
|
|
2453
|
Tuesday, June 06, 2023, 17:36 |
Carla Babcock | ITW | Standard Operation | TM2 | TiC#6 | Module conditioning | Conditioned TM2 up to 48kV in ITW. Some
sparks and current is not very stable. Drawing
about 178uA at 48kV. |
|
|
2473
|
Tuesday, August 08, 2023, 13:01 |
David Wang | North Hot-Cell | Standard Operation | TM2 | TiC#6 | TM2 TiC#6 post run electrical check at NHC. | TM2 TiC#6 post run electrical check has
been done at TCS. See attachment |
|
|
2476
|
Wednesday, August 09, 2023, 13:43 |
Carla Babcock | North Hot-Cell | Standard Operation | TM2 | TiC#6 | TiC#6 PIE | PIE on TiC#6 was done in the NHC. The target
assembly looked brand new when we took it
out, no heating spots or deposits (pictures |
|
|
2478
|
Wednesday, August 23, 2023, 10:45 |
Travis Cave | Spent Target Vault | Standard Operation | | TiC#6 | Spent Target Move | TiC #6 moved from north hot cell
to spent target vault placed in pail #232
put in spot 6A and the field was 151mSv/hr |
|
|
2439
|
Monday, May 08, 2023, 10:59 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | TiC#5 | electrical check/leak check | TM4 with target TiC#5 installed has
been leak checked and electric checked on
NHC. |
|
|
2440
|
Wednesday, May 10, 2023, 08:40 |
Frank Song | ITE | Standard Operation | TM4 | TiC#5 | Module Connection | TM4 was connected in ITE. pics
attached FYI. |
 |
|
2443
|
Monday, May 22, 2023, 15:06 |
Carla Babcock | ITE | Standard Operation | TM4 | TiC#5 | Module conditioning | Yesterday and today module conditioning
was done on Tm4 in ITE. This is the first
ramp up after the shutdown and ITE is planned |
|
|
2445
|
Wednesday, May 24, 2023, 17:25 |
Carla Babcock | ITE | Repair | TM4 | TiC#5 | Issues with anode short | When I tried to raise the anode voltage
in cathode bias mode on May 23 evening, I
found the target or tube shorted to HV common. |
|
|
2448
|
Tuesday, May 30, 2023, 12:23 |
Frank Song | ITE | Standard Operation | TM4 | TiC#5 | gas lines pump out in ITE Faraday Cage | argon is being supplied at 6 psi to TM4. |
|
|
2455
|
Tuesday, June 13, 2023, 09:55 |
Frank Song | ITE | Standard Operation | TM4 | TiC#5 | module disconnection | TM4 with TiC#5 was disconnected in
ITE and moved to NHC. |
|
|
2456
|
Tuesday, June 13, 2023, 11:45 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | TiC#5 | electrical check | TM4 with spent target TiC#5 electric
check after moving from ITE to NHC. |
|