  ID Date Author Category Type Moduledown Target/Number Subject
  2438   Thursday, May 04, 2023, 07:14 David WangSafe Module ParkingStandard OperationTM4  SMP vacuum pumpimg down is stopped.

SMP  vacuum pumping down is stopped. SMP and TM4 venting to atmosphere will be started soon.

  2439   Monday, May 08, 2023, 10:59 Frank SongNorth Hot-CellStandard OperationTM4TiC#5electrical check/leak check

 TM4 with target TiC#5 installed has been leak checked and electric checked on NHC.

Attachment 1: TM4_with_TiC#5_20230508.png
TM4_with_TiC#5_20230508.png
  2440   Wednesday, May 10, 2023, 08:40 Frank SongITEStandard OperationTM4TiC#5Module Connection

 TM4 was connected in ITE.  pics attached FYI.

Attachment 1: TM4_with_TiC5_connection_in_ITE_20230509.png
TM4_with_TiC5_connection_in_ITE_20230509.png
Attachment 2: TM4_with_TiC5_all_set_in_ITE_20230510_758AM.JPG
TM4_with_TiC5_all_set_in_ITE_20230510_758AM.JPG
  2443   Monday, May 22, 2023, 15:06 Carla BabcockITEStandard OperationTM4TiC#5Module conditioning

Yesterday and today module conditioning was done on Tm4 in ITE. This is the first ramp up after the shutdown and ITE is planned to run at high voltages for the first weeks. The module is behaving well - went up to 40kV yesterday, stayed there for an hour, and up to 46kV today. Current draw is 113uA at 46kV. No serious sparking.

 

Tuesday, May 23, 2023, 09:32 :  Ramping up again, easy to 45kV. Drawing 132uA at 49kV. Still behaving quite well.

  2445   Wednesday, May 24, 2023, 17:25 Carla BabcockITERepairTM4TiC#5Issues with anode short

When I tried to raise the anode voltage in cathode bias mode on May 23 evening, I found the target or tube shorted to HV common. Investigations in the faraday cage today showed the same. I removed all the new electronics (resistors, gemovs, etc) from the power supply to no effect, so I disconnected the TGHT supply and pushed it away from the busbars. There was still a short. David Frank and I then went down to the pit and disconnected everything to measure the module. The module itself showed no short, and the bus bars in the chase for TGHT showed no short, though the ones for TBHT still showed the short.

David and Frank reconnected the module and I disconnected the TBHT supply in the faraday cage, then I found no shorts to TGHT/TBHT. When I reconnected everything there were still no shorts. There must have been a short in the TBHT line in the faraday cage, and another short in the TGHT line in either the faraday cage or on the module top. Both these shorts got resolved by taking everything apart. Still not sure how it happened.

Next I found I could not raise the anode voltage above 230V, it looked like it was current limiting but since the current limit was high, I figured it had something to do with the new electronics installed. I disconnected them all the in cage and that solved the problem, and then reconnecting the gemovs that go from the PSU terminals to HV common caused the problem again, so I left those disconnected.

  2448   Tuesday, May 30, 2023, 12:23 Frank SongITEStandard OperationTM4TiC#5gas lines pump out in ITE Faraday Cage

argon is being supplied at 6 psi to TM4. 

Attachment 1: Argon_supplied_at_6psi_to_TM4_in_ITE.JPG
Argon_supplied_at_6psi_to_TM4_in_ITE.JPG
  2455   Tuesday, June 13, 2023, 09:55 Frank SongITEStandard OperationTM4TiC#5module disconnection

 TM4 with TiC#5 was disconnected in ITE and moved to NHC.

Attachment 1: TM4_with_TiC#5_(FEBIAD)disconnected_in_ITE_20230613.pdf
TM4_with_TiC#5_(FEBIAD)disconnected_in_ITE_20230613.pdf TM4_with_TiC#5_(FEBIAD)disconnected_in_ITE_20230613.pdf TM4_with_TiC#5_(FEBIAD)disconnected_in_ITE_20230613.pdf
  2456   Tuesday, June 13, 2023, 11:45 Frank SongNorth Hot-CellStandard OperationTM4TiC#5electrical check

 TM4 with spent target TiC#5 electric check after moving from ITE to NHC.

Attachment 1: TM4_with_spent_target_electric_check_right_after_moving_to_NHC.png
TM4_with_spent_target_electric_check_right_after_moving_to_NHC.png
  2457   Tuesday, June 13, 2023, 11:49 Frank SongNorth Hot-CellStandard OperationTM4SiC#45electrical check and leak check

 TM4 with new target SiC#45 installed has been leak checked and electrical checked on top of NHC.

Attachment 1: TM4_with_SiC#45_leak&electric_check_on_top_of_NHC.png
TM4_with_SiC#45_leak&electric_check_on_top_of_NHC.png
  2458   Wednesday, June 14, 2023, 07:10 Frank SongITEStandard OperationTM4SiC#45TM4 with SiC#45 connection in ITE

 TM4 with new target SiC#45 was connected in ITE, all TPs are running at their full speed.

Attachment 1: TM4_with_SiC#45_connected_in_ITE_20230613.pdf
TM4_with_SiC#45_connected_in_ITE_20230613.pdf TM4_with_SiC#45_connected_in_ITE_20230613.pdf TM4_with_SiC#45_connected_in_ITE_20230613.pdf TM4_with_SiC#45_connected_in_ITE_20230613.pdf
  2459   Wednesday, June 14, 2023, 13:37 David WangITEStandard OperationTM4 ITE water signal interlock check

ITE water signal interlock check including HS,EE, TA, TU, MSP. Coil1 , C-window ,2a-window, 2A tank, 2A shielding plug , 2A dump, 2A collimator  are done. All things work.

  2464   Tuesday, July 18, 2023, 10:08 Frank SongNorth Hot-CellStandard OperationTM4SiC#45module disconnection & electrical check right after transferred from ITE to NHC

 TM4 with spent target SiC#45 was disconnected ITE  and an electrical check made right after moved on NHC. 

Attachment 1: TM4_with_SiC45_disconnection_and_e_check.pdf
TM4_with_SiC45_disconnection_and_e_check.pdf TM4_with_SiC45_disconnection_and_e_check.pdf TM4_with_SiC45_disconnection_and_e_check.pdf TM4_with_SiC45_disconnection_and_e_check.pdf
  2465   Wednesday, July 19, 2023, 08:04 Frank SongITEStandard OperationTM4UCx#42Module Connection

 TM4 with new target UCx#42 was connected in ITE. 

Attachment 1: TM4_with_UCx42_connection_in_ITE_20230718.pdf
TM4_with_UCx42_connection_in_ITE_20230718.pdf TM4_with_UCx42_connection_in_ITE_20230718.pdf TM4_with_UCx42_connection_in_ITE_20230718.pdf TM4_with_UCx42_connection_in_ITE_20230718.pdf
  2466   Wednesday, July 19, 2023, 08:09 Frank SongNorth Hot-CellStandard OperationTM4UCx#42electrical check

 An electrical check was made after new target installed on TM4.

Attachment 1: E__check_after_UCx42_installed_on_TM4.pdf
E__check_after_UCx42_installed_on_TM4.pdf
  2483   Tuesday, August 29, 2023, 09:33 Frank SongITEStandard OperationTM4UCx#42module disconnection

 TM4 with spent target UCx#42 was disconnected in ITE and has been remote moved to NHC this morning.

Attachment 1: TM4_with_UCx42_Disconnection_in_ITE_2023-08-29.pdf
TM4_with_UCx42_Disconnection_in_ITE_2023-08-29.pdf TM4_with_UCx42_Disconnection_in_ITE_2023-08-29.pdf TM4_with_UCx42_Disconnection_in_ITE_2023-08-29.pdf
  2484   Tuesday, August 29, 2023, 10:45 Frank SongNorth Hot-CellStandard OperationTM4UCx#42electrical check

  TM4 with spent target UCx#42 has been electric checked at NHCpost right after transferred from ITE.

Attachment 1: TM4_with_UCx42_electric_check_with_spent_target_at_NHCPost__2023-08-29.pdf
TM4_with_UCx42_electric_check_with_spent_target_at_NHCPost__2023-08-29.pdf
  2485   Tuesday, August 29, 2023, 14:32 Frank SongNorth Hot-CellStandard OperationTM4Ta#65electrical check/leak check

 TM4 with new target Ta#65 has been E/L checked at NHCPost.

Attachment 1: TM4_electric_and_leak_check_after_Ta#65_installed_2023-08-29.pdf
TM4_electric_and_leak_check_after_Ta#65_installed_2023-08-29.pdf
  2486   Tuesday, August 29, 2023, 14:32 Frank SongNorth Hot-CellStandard OperationTM4Ta#65electrical check/leak check

 TM4 with new target Ta#65 has been E/L checked at NHCPost.

Attachment 1: TM4_electric_and_leak_check_after_Ta#65_installed_2023-08-29.pdf
TM4_electric_and_leak_check_after_Ta#65_installed_2023-08-29.pdf
  2488   Wednesday, September 06, 2023, 08:07 Frank SongITEStandard OperationTM4Ta#65Module Connection

 TM4 was connected in ITE with new target Ta#65 installed. see attachment in detail.

Attachment 1: TM4_with_Ta#65_connection_in_ITE_2023-09-05.pdf
TM4_with_Ta#65_connection_in_ITE_2023-09-05.pdf TM4_with_Ta#65_connection_in_ITE_2023-09-05.pdf TM4_with_Ta#65_connection_in_ITE_2023-09-05.pdf TM4_with_Ta#65_connection_in_ITE_2023-09-05.pdf
  2498   Tuesday, November 07, 2023, 13:42 Frank SongSouth Hot-CellStandard OperationTM4Ta#65electrical check with the spent target

TM4 with spent target Ta#65 was electrical checked right after being moved to SHC. 

Attachment 1: TM4_with_Spent_Target_Ta#65_electrical_check_on_SHC_2023-11-07.pdf
TM4_with_Spent_Target_Ta#65_electrical_check_on_SHC_2023-11-07.pdf