Entry  Tuesday, June 07, 2016, 17:11, David Wang, Conditioning Station, Standard Operation, TM4, UC#16, TM4 UCx16 electrical check and leak check at SHC UCX_16_electrical_test.pdfelectrical_check._TM4_UCx16_at_TCS..pdf

Chad and I finished the TM4 UCx6 electrical check and leak check at SHC. Leak check result on HS line is good. There is a dead short between "Z" repellor and HS during the first time electrical check. The dead short disappeared after re- installation of UCx 14 target onto TM4. See attachment

 Anders and I did another electrical check on TM4 at TCS under vacuum. See attachment 2

Entry  Tuesday, June 07, 2016, 17:14, David Wang, Conditioning Station, Standard Operation, TM4, UC#16, TM4 with UCx16 target has been moved from SHC to TCS. 

Bill and Yasmine did the move remotely this afternoon. The move is successful.

Entry  Tuesday, June 07, 2016, 18:17, David Wang, Conditioning Station, Standard Operation, TM4, UC#16, TM4 and TCS turbo pumps are started. 

TM4 and TCS vacuum system are connected.   Turbo pumps are started.  Everything is fine so far.

Entry  Wednesday, June 08, 2016, 08:25, Anders Mjos, Conditioning Station, Standard Operation, TM4, UC#16, Conditioning UC#16 UC#16.docxTCS-2016-06-08_UC#16.rga

 Wednesday, June 08, 2016, 08:15: RGA on


Thursday, June 09, 2016, 09:00: Water on by David. TK2 level dropped by about 1.5 in.

Thursday, June 09, 2016, 10:30: BIAS / EL / EE to 10 / 5 / 0.5 kV

Thursday, June 09, 2016, 10:44: Started heater ramp. TGHT / TBHT to 40 / 20 A at 1 / 0.5 A/min. IG2 vacuum limits 2E-6 / 3E-6 T

Thursday, June 09, 2016, 11:59: Continue ramping to 100 / 50 A.


Friday, June 10, 2016, 08:04: Continue ramping to 300 / 150 A IG2 vacuum limits 1.9E-6 / 2.3E-6 T

Friday, June 10, 2016, 21:32: Stopped ramping at 275 A /  138.5 A


Saturday, June 11, 2016, 11:40: Ramped to 281 A / 140 A


Sunday, June 12, 2016, 08:31: Ramped to 290 A / 145 A

Sunday, June 12, 2016, 08:49: Ramped to 300 A / 150 A


Monday, June 13, 2016, 08:06: Continue ramping to 400 / 200 A

Monday, June 13, 2016, 17:00: TGHT / TBHT at 390 A / 195 A.

Monday, June 13, 2016, 17:17: BIAS / EL / EE to 30 / 15 / 1.5 kV

Monday, June 13, 2016, 18:02: Ramping down TGHT / TBHT at 2 / 1 A/min

Monday, June 13, 2016, 21:39: Source off. Water, RGA, vacuum off.

Entry  Thursday, June 09, 2016, 08:37, David Wang, Conditioning Station, Standard Operation, TM4, UC#16, TM4 with UCx16 helium pressure test at TCS TM4_withUCx16_helium_pressure_test_at_TCS.pdf

I did a helium pressure test on TM4 at TCS with UCX16 target installed on the module. No leak has been found on all using water lines in TM4. See attachment for detail.

Entry  Thursday, June 09, 2016, 09:44, David Wang, Conditioning Station, Standard Operation, TM4, UC#16, TM4 has been connected at TCS 

It is ready for HV conditioning/ heating. 

Entry  Tuesday, June 14, 2016, 08:04, David Wang, Conditioning Station, Standard Operation, TM4, UC#16, TM4 has been disconnected at TCS 

The TM4 and TCS are vented with argon. 

Entry  Tuesday, June 14, 2016, 10:51, Travis Cave, ITE, Standard Operation, TM4, UC#16, module moved 

TM#4 with UC#16 has been moved from the conditioning station to the east target station.

Entry  Tuesday, August 02, 2016, 11:02, Travis Cave, ITE, Standard Operation, TM4, UC#16, module moved 

TM#4 with UC#16 has been moved from the east station to the south hot cell. The shield plug was also install remotely once it was hooked up due to alphas.

Entry  Tuesday, August 02, 2016, 13:32, chad fisher, South Hot-Cell, Standard Operation, TM4, UC#16, UC#16 Removed #17 installed 

UCx#16 has been removed from TM$ and UCx#17 installed, high current conductors toqued to 130 in lbs.

 

UCx#16 did not show the standard arcing marks on the 9 pin connector.

In regards to the 9 pin connector on number 17, it was by far the best fitting TM4 target with 9 pin as it required no "fiddling" during installation.

Entry  Thursday, August 04, 2016, 08:56, Travis Cave, Spent Target Vault, Standard Operation, , UC#16, Spent Target move Vault_Storage_August_3_2016.pdf

The spent UC #16 have been moved from the south hot cell to the storage vault see attached PDF for details.

Entry  Friday, April 01, 2016, 11:41, Travis Cave, South Hot-Cell, Standard Operation, TM1, UC#15, Electrical Check TM1_elec_chk_UC#15_SHC.PDF

Electrical check of the target on TM#1, target in question is UC#15. See PDF for details.

Entry  Friday, April 01, 2016, 13:58, Travis Cave, Conditioning Station, Standard Operation, TM1, UC#15, module moved 

TM#1 has been moved from the conditioning station to the south hot cell, had UC#15 installed and then moved back to the conditioning station.

Entry  Tuesday, April 05, 2016, 07:12, David Wang, Conditioning Station, Standard Operation, TM1, UC#15, stop CS vacuum pumps. 

Stop TCS vacuum pumps . Preparing argon venting on TM1 and TCS.

7:34 AM, Disconnected TM1 at TCS, argon venting now.

Entry  Tuesday, April 05, 2016, 09:33, Travis Cave, ITW, Standard Operation, TM1, UC#15, module moved 

TM#1 with UC#15 have been moved from the conditioning station to the west target station.

Entry  Tuesday, May 17, 2016, 11:47, Travis Cave, South Hot-Cell, Standard Operation, TM1, UC#15, module moved 

TM#1 has been moved from the west target to the south hot cell. The target on TM#1 is UC#15.

Entry  Tuesday, May 17, 2016, 14:15, Travis Cave, ITW, Standard Operation, TM1, UC#15, module moved 

TM#1 with UC#15 was moved back to the west station due to alpha concerns.

Entry  Wednesday, May 18, 2016, 11:42, Travis Cave, South Hot-Cell, Standard Operation, TM1, UC#15, module moved 

TM#1 with  UC#15 has been moved from the west target station to the south hot cell. The target shield plug was also remotely installed as well.

Entry  Tuesday, May 24, 2016, 10:52, Travis Cave, Spent Target Vault, Standard Operation, , UC#15, Spent Target move Vault_Storage_May_24_2016.pdf

Spent UC#15 has been moved from the south hot cell to the spent target storage. It was placed in pail number 136, and placed in spot C of tray one. It was 14.1mSv/hr upon removal from the south hot cell.

Entry  Wednesday, April 06, 2016, 14:52, Travis Cave, South Hot-Cell, Standard Operation, TM4, UC#14, No Target, Ta#47, Electrical Check TM4_elec_chk_notgt_SHC.PDFTM4_elec_chk_Ta47_SHC.PDFTM4_elec_chk_UC14_SHC_postbeam.PDF

Various electrical checks done on TM#4, one of post beam UC#14, of no target and with Ta#47. See PDFs for details.