Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1236     Entry time: Tuesday, May 17, 2016, 11:47
Author: Travis Cave 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM1 
Target/Number: UC#15 
Subject: module moved 

TM#1 has been moved from the west target to the south hot cell. The target on TM#1 is UC#15.

ELOG V2.9.2-2455