Entry  Monday, April 12, 2021, 13:45, Anders Mjos, Cooling, Maintenance, , , New T installed for instrumentation loop on HALCW system MicrosoftTeams-image_(9).png
Adrian and co installed a new T to be able to add an instrument loop for O2 and pH monitoring on the low conductivity water systtem (photo). See WP I2021-04-09-4
Entry  Friday, March 26, 2021, 12:22, Adam Newsome, Crane, Development, , , Aux Hoist Pendant Upgrade 
The crane pendant for the auxiliary hoist was upgraded to a FLEX EX2 style  pendant by Canco Cranes. The installation work was performed by  Canco, supervised
by Tom Kauss and David Wang.  Installation work was performed in one day (I2021-03-26-1).
Items installed include: new pendant (2 motion, 2 speed) 
Entry  Thursday, March 25, 2021, 10:38, David Wang, Spent Target Vault, Standard Operation, , C#1, Remove pail 237 spent target C#1 from storage vault to mini storage.  
Pail 237 only has 200u sv/hr field at 0.5 meter. On contact measurement: 0.9 to 1.6 m sv/hr.and less than 80 count contamination outside the pail.  
It is moved to mini storage. We will transfer this pail to cyclotron vault and store it there later.
Entry  Thursday, March 25, 2021, 08:55, Anders Mjos, Conditioning Station, Maintenance, , , Filters inspected and cleaned on water circuit 
By Curtis. See Work Permit I2021-03-24-1 for details.
Entry  Tuesday, March 23, 2021, 09:47, David Wang, South Hot-Cell, Standard Operation, TM3, , TM3 has been moved from TCS to SHC. 
Frank and I removed Tm3 from TCS to SHC. The move is successful. 
Entry  Wednesday, March 17, 2021, 11:43, Frank Song, ITE, Repair, , , Re-connect Entrance Module in ITE  job_done_by_following_#190510.pdf
 David and I re-connect Entrance module at ITE after the monitor been replaced at SHC. 
Entry  Wednesday, March 17, 2021, 09:10, Travis Cave, ITE, Standard Operation, , , Entrance module move 
 The east entrance module is now back at the east target station.
Entry  Monday, March 15, 2021, 13:01, Isaac Earle, Crane, Development, , , Plate & pin lift assembly load testing (ITA6550) 11x
In mid-2020 design analysis was completed on the steel plate & pin assemblies (ITA6550) used to connect the ISAC target hall crane hook block to
the module lifting yoke assembly ITA0494.  The released design note is Document-184431.  
In November 2020 fabrication was completed on two full plate & pin assemblies (photos attached below).  As per the relevant ASME standards
Entry  Friday, March 12, 2021, 11:36, Travis Cave, South Hot-Cell, Maintenance, , East Entrance Module, Entrance module move 
 The East Entrance Module has been moved from the East Target Station to the South Hot Cell.
Entry  Thursday, March 11, 2021, 11:42, Frank Song, ITE, Maintenance, , , ITE water flow wheels and coils replacement. 
 ITE water flow wheels and coils are replaced. Wheels and coils on Oven, Tube, HS, EE, MSP,
Febiad coil, containment box window, dump, dump plug, 2A window, and tank return circuits are replaced with new parts.
Entry  Friday, March 05, 2021, 09:12, Matthew Gareau, North Hot-Cell, Development, TM3, , Containment box door removal and swivel arm test Containment_door_arm_testing_on_TM3.jpg
First thing I entered into the NHC to install to the target kart mounting clip, and remove excess tools and materials from the hotcell
After the TM3 without a target was lowered into the NHC.
Once inside, with the use of the manipulators, I was able to remove the containment box door, place it on the swivel arm, move the arm out of the
Entry  Thursday, March 04, 2021, 16:30, Isaac Earle, North Hot-Cell, Development, , , NHC gas delivery lines leak checked 
 The North Hot Cell gas delivery lines (labeled 1, 2, and 3 on the hot and cold side panels) were leak checked today.  5psi helium gas was
applied to each line in turn with the appropriate solenoid valve opened and a Staubli connector with plastic tubing and the leak check wand attached to
the matching connector inside the cell.  The end of the wand was sealed using tape.  The Agilent G8601 leak detector was used on "sniffing"
Entry  Thursday, March 04, 2021, 13:54, David Wang, Conditioning Station, Standard Operation, TM3, , TM3 has been moved to NHC from silo 
TM3 has been moved from silo to NHC. The move is successful. NHC ram stand and NHC protection railings are checked and installed. Everything works fine.
2021-03-05. TM3 has been moved from NHC to silo. The move is successful. 
Entry  Thursday, March 04, 2021, 11:20, David Wang, ITW, Maintenance, , , ITW water flow wheels and coils replacement. 
ITW water flow wheels and coils are replaced. Wheels and coils on Oven, Tube, HS, EE, MSP, Febiad coil, containment box window, dump,dump plug, 2A window,
and tank return circuits are replaced with new parts. 
Entry  Tuesday, March 02, 2021, 08:12, David Wang, Conditioning Station, Standard Operation, , , TCS leak check.  
TCS leak check: TCS IG1S1.6 XE- 6 torr. LD  0.0XE-9atm.cc/sec.We used a long pole to spray helium to TCS vacuum seals on diagnostic box and vessel
body. Lots helium have been sprayed around the check area.  no leak has been found. 
Entry  Thursday, February 25, 2021, 10:09, Frank Song, ITE, Repair, , , Disconnect Entrance Module in ITE 
 David and I disconnected entrance module in ITE by following the procedure # 190510. And, the yoke was installed and left on for remote handling
later. 
Entry  Tuesday, February 23, 2021, 09:00, David Wang, Assembly/Bench Test, Maintenance, , , target staion vacuum pumps inspection. 
Edi and I inspected roughing pump ITM MP1, primary backup pump ITHMP1, and secondary backup pump ITHMP2. We checked oil level and color on all pumps. 
Refilled lubricant to ITMMP1. ITHMP1 and MP2 oil level is fine. ITH MP1 oil color is darker than MP2. But, both them are ok still. Shielding block has
been restored after the job.
Entry  Thursday, February 18, 2021, 12:59, David Wang, Assembly/Bench Test, Maintenance, , , TM3 source tray and old resin can storage in lower cyclotron basement 
TM3 old source tray, old target hall high active water resin tank, and  old 2A window RH clamp are transferred from TH to cyclotron lower vault
basement 10 and 10A location for storage. They are placed beside and in front of old TM1 and TM2 source tray boxes which stored there in 2018.  
Entry  Thursday, February 18, 2021, 12:33, David Wang, ITE, Repair, , , ITE:TP1S 
ITE TP1S new pump is installed today. Reset pump life time on controller to 0 hr. 
Entry  Tuesday, February 16, 2021, 14:00, Adam Newsome, Crane, Development, , , Crane pendant upgrade PXL_20210216_183711834.jpg
The crane pendant for the main hoist was upgraded to a FLEX EX2 style pendant by Canco Cranes. The installation work was performed by Matt at Canco,
supervised by Tom Kauss, David Wang, and Adam Newsome. Installation work was performed in two phases since the initial installation did not provide adequate
range and an antenna issue needed to be resolved (I2021-01-14-1,