Entry  Tuesday, June 25, 2024, 11:59, David Wang, ITE, Standard Operation, TM3, SiC #46, Tm3 has been moved from TCS to ITE. 
Tm3 has been moved from TCS to ITE. the move is smooth.
Entry  Wednesday, May 01, 2024, 14:51, David Wang, South Hot-Cell, Standard Operation, TM3, , Tm3 has been moved form TCS to SHC. 
Travis and I moved TM3 from TCS to SHC this afternoon. The move is smooth. 
Entry  Wednesday, May 08, 2024, 12:37, David Wang, ITE, Standard Operation, TM3, UCx#44, Tm3 has been moved form TCS to ITE 
The move is smooth and successful.
Entry  Friday, June 14, 2024, 11:56, David Wang, ITE, Standard Operation, TM3, UCx#44, Tm3 has been moved form ITE to SHC. 
Tm3 has been moved form ITE to SHC. the move is smooth. 
Entry  Wednesday, September 18, 2024, 13:47, David Wang, South Hot-Cell, Standard Operation, TM3, TiC#8, Tm3 has been moved from silo to SHC. 
Tm3 has been moved  from silo to SHC. The move is smooth. 
Entry  Tuesday, January 28, 2025, 11:47, David Wang, Conditioning Station, Standard Operation, TM3, No target, Tm3 has been moved from TCS to silo. 
Tm3 has been moved  from TCS to silo. The move is successful.
Entry  Thursday, March 28, 2024, 09:26, David Wang, South Hot-Cell, Standard Operation, TM3, , Tm3 has been moved from SHC to silo. 
Tm3 has been moved  from SHC to silo. The move is smooth. 
Entry  Wednesday, September 25, 2024, 09:12, David Wang, South Hot-Cell, Maintenance, TM3, , Tm3 has been moved from SHC to silo. 
Tm3 has been moved  from SHC to silo. the move is smooth.
Entry  Friday, May 10, 2024, 09:04, David Wang, ITE, Standard Operation, TM3, UCx#44, Tm3 has been connected in ITE.  Scanned_from_a_Xerox_Multifunction_Printer.pdf
Tm3 has been connected in ITE.  see attachment.
Entry  Tuesday, June 18, 2024, 11:59, David Wang, South Hot-Cell, Standard Operation, TM3, , Tm3 electrical check without target. TM3_without_target_2024_june_18.pdf
Tm3 electrical check without target is done. Everything is good including 2 x 5 pin connectors( all OL at 250 V to 60 KV and each other)  see attachment.
Entry  Wednesday, June 19, 2024, 14:16, David Wang, South Hot-Cell, Standard Operation, TM3, SiC #46, Tm3 electrical check with SiC#46 target at SHC TM3_with_SiC_46#_target_electrical_check_at_SHC.pdf
Tm3 electrical check with SiC#46 target  and HS line helium spray check at SHC. were done. everything is good. see attachment.
Entry  Tuesday, October 20, 2015, 12:49, Dan McDonald, ITW, Standard Operation, , SiC#32, Tm2 hook up In ITW 
Lower and disconnect TM2 from crane in ITW, proceed with hooking up TM2 as per checklist with Anders. Double check flow meters and coils, reset TP1 and
TP2
Entry  Wednesday, July 03, 2024, 14:01, David Wang, Conditioning Station, Standard Operation, TM2, , Tm2 has been moved from TCS to SW silo. 
Tm2 has been moved from TCS to SW silo. the move is smooth.
Entry  Wednesday, June 26, 2024, 13:49, David Wang, Conditioning Station, Standard Operation, TM2, , Tm2 has been moved from SW silo to TCS. 
Tm2 has been successfully moved from SW silo to TCS. 
Entry  Tuesday, October 08, 2024, 11:46, David Wang, ITE, Standard Operation, TM2, Ta#68., Tm2 has been moved form SHC to ITE. 
Tm2 has been moved form SHC to ITE. The move is smooth. 
Entry  Tuesday, October 08, 2024, 11:45, David Wang, South Hot-Cell, Standard Operation, TM2, , Tm2 electrical check with Ta#68 installed at SHC.  TM2_Ta#68_electrical_check.pdf
ABCD was dead shorted to 60kv bias during the first time measurement after target installation. Target was removed and reinstalled again with new VCR
seals by Ferran.  during target removal process, short disappeared when Aaron remove bolts on CD tube heaters terminal.  leak check and electrical
check result are good after second time target installation. 
Entry  Tuesday, March 06, 2018, 09:53, David Wang, ITW, Standard Operation, TM2, , Tm2 and Tm4 vacuum disconnection TM2_TM4_disconnection_Vacuum.pdf
The job is done. See attachment.
Entry  Wednesday, August 09, 2023, 13:13, David Wang, Conditioning Station, Standard Operation, TM2, Nb#10, Tm2 Nb#10 has been connect at TCS. 
TM2 Nb#10 has been connect at TCS. TCS water system and vacuum system have been started. Everything looks ok so far. TCS Faraday cage is secured for
TM2 conditioning at TCS. 
Entry  Thursday, November 28, 2024, 16:13, Aaron Tam, South Hot-Cell, Standard Operation, , TiC#9 Parasitics, TiC#9 Parasitics Leak Check and removal from hotcell Leak_Test.jpgDissassembly.jpgSeal_Seat.jpgPEEK_seal.jpgPEEK_Seal_Closer_look.jpg
 November 27th, 2024 - Aaron Tam with Farran & David 
Parasitic Assembly Leak Check (Aaron, Farran, David)
-Note that the furthest upstream (right of the target) parasitic top cap screws had been loosened and retightened in
Entry  Friday, November 08, 2024, 10:54, Aaron Tam, South Hot-Cell, Standard Operation, , TiC#9, TiC#9 Pail Loading into Pail#299 
 Nov. 8, 2024 - Aaron Tam 
Tong cable snapped when attempting to remove multipin connector bracket 
Assistance from Chad required for the rest of procedure 