ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
Text |
 |
703
|
Wednesday, July 16, 2014, 13:02 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | UC#9 | Electrical check | Electrical check of the TM#1 with UC#9
post beam at the south hot cell. |
|
704
|
Wednesday, July 16, 2014, 13:56 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | UCx#9 | UCx#9 off Ta on | The UCx#9 target has been revomed from
the target module...leg A was broken as suspected.
Ta#42 has been installed. High current |
|
705
|
Wednesday, July 16, 2014, 13:59 |
chad fisher | South Hot-Cell | Standard Operation | TM3 | SiC#30 | Sic#30 install | Just some notes on the install of SiC#30
on TM3 last month...It was installed with
all new fasteners and torque values provided |
|
706
|
Wednesday, July 16, 2014, 14:28 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | Ta#43 | Electrical check | TM#1 with Ta#43 electrical check see attached
PDF. |
|
707
|
Thursday, July 17, 2014, 09:29 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | Ta#43 | module move | TM#1 with Ta#43 has been moved from the
south hot cell to conditioning station. |
|
708
|
Thursday, July 17, 2014, 10:13 |
David Wang | Conditioning Station | Standard Operation | TM1 | | Leak check on TM1 HS water line with new target installed | Chad and I leak checked TM1 HS waterline
with new target installed at SHC. The LD
base LR:0.0xE-9atm.cc/sec, base pressure: |
|
709
|
Thursday, July 17, 2014, 11:49 |
David Wang | Conditioning Station | Standard Operation | TM1 | | TM1 and CS turbo pumps have been started | I connected TM1 at CS. All turbo pumps
have been started. The pumping down is
good so far. |
|
710
|
Monday, July 21, 2014, 13:11 |
David Wang | Conditioning Station | Standard Operation | TM1 | | helium pressure test on TM1 HS water line at CS. | The TM1 HS line is pressure tested
this morning with 70 psi helium at
CS. No response has been found on leak detector. |
|
711
|
Tuesday, July 22, 2014, 07:32 |
David Wang | Conditioning Station | Standard Operation | TM1 | | Stop TM1 and CS turbo pumps and ruff pump. | Stop TM1 and CS turbo pumps and ruff pump.
TM1 is disconnect at CS. It will be vented
tomorrow morning and moved to ITW. |
|
712
|
Wednesday, July 23, 2014, 13:36 |
David Wang | ITW | Standard Operation | TM1 | | TM1 in ITW. | TM1 has been connected in ITW .
The new roughing pump replaced on last Friday
works good. I started all turbo pumps in |
|
713
|
Thursday, July 24, 2014, 09:10 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | module move | TM#2 has been moved to the hot cell from
the north east silo. |
|
715
|
Monday, July 28, 2014, 09:29 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | no target | module move | TM#2 has been moved from the south hot
cell to the conditioning station. |
|
720
|
Thursday, July 31, 2014, 08:08 |
chad fisher | South Hot-Cell | Standard Operation | TM3 | SiC#30 | SiC#30 Removed and inpect | SiC#30 has been removed from TM3. A quick
exam of TM3 source tray did not yield
any obvious signs of damage. |
   |
721
|
Tuesday, August 05, 2014, 10:40 |
Travis Cave | ITE | Standard Operation | | | module move | ITE Entrance module has been moved back
to the east station. |
|
723
|
Wednesday, August 06, 2014, 11:11 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | no target | module move | TM#3 with no target has been moved to the
northwest silo for storage. |
|
724
|
Wednesday, August 06, 2014, 11:12 |
Travis Cave | South Hot-Cell | Standard Operation | | SiC#30 | Spent target move | SiC#30 in pail #117 has been move to the
spent target vault and placed in spot 2C.
See attached PDF for details. |
|
725
|
Thursday, August 07, 2014, 10:45 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target | module move | TM#4 has been moved from the south west
silo to the south hot cell. |
|
726
|
Thursday, August 07, 2014, 13:58 |
David Wang | South Hot-Cell | Standard Operation | TM4 | UCx #10 | Leak check on TM4 HS water line with new UCX target. | Isaac and I leak checked TM4 HS line with
new UCX target. The leak detector base LR
0.0xE-9 atm.cc/sec, base pressure0.0xE-4torr. |
|
727
|
Thursday, August 07, 2014, 17:07 |
David Wang | Conditioning Station | Standard Operation | TM4 | UCx #10 | TM4 is connected in CS. | TM4 is connected at CS. All turbo pumps
are started. The pumping down is good so
far. |
|
728
|
Friday, August 08, 2014, 08:47 |
David Wang | Conditioning Station | Standard Operation | TM4 | UCx #10 | helium pressure test on TM4 HS water line at CS. | Helium pressure test on TM4 HS water line
at CS is finished. 80psi helium no leak. |
   |