Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 728     Entry time: Friday, August 08, 2014, 08:47
Author: David Wang 
Category: Conditioning Station 
Type: Standard Operation 
Module: TM4 
Target/Number: UCx #10 
Subject: helium pressure test on TM4 HS water line at CS. 

Helium pressure test on TM4 HS water line at CS is finished. 80psi helium no leak. 

Attachment 1: 015.JPG  3.161 MB  | Show | Hide all
Attachment 2: 012.JPG  2.436 MB  Uploaded Friday, August 08, 2014, 09:49  | Show | Hide all
Attachment 3: 016.JPG  2.345 MB  Uploaded Friday, August 08, 2014, 09:49  | Show | Hide all
Attachment 4: 014.JPG  3.671 MB  Uploaded Friday, August 08, 2014, 09:50  | Show | Hide all
ELOG V2.9.2-2455