  ID Date Author Category Type Moduledown Target/Number Subject Text Attachments
  1753   Monday, July 16, 2018, 17:41 Anders MjosITEStandard OperationTM4UC#22Target module disconnectedThe water and electrical connections were
disconnected today as protons remained off
after power interruption during the weekend.
 TM4_UCx_22#__disconnection_check_list_1.pdfTM4_UCx_22#__disconnection_check_list_2.pdf 
  1754   Wednesday, July 18, 2018, 14:20 chad fisherSouth Hot-CellStandard OperationTM4Ta#56Ta#56 InstalledTa#56 has been installed onto TM4 with
new fasteners. High current fasteners torqued
to 130 in lbs.
  
  1755   Thursday, July 19, 2018, 09:17 chad fisherSouth Hot-CellRepairTM4 New Optics Tray ModificationThe waterline loop bracket has been installed
onto the new loop holding bracket and both
installed onto the new source tray.
 20180719_TM4_2.jpg20180709_TM4.jpg 
  1757   Monday, July 23, 2018, 10:31 Travis CaveITEStandard OperationTM4Ta#56Module move TM#4 with Ta#56 has been moved from
the conditioning station to the east target
station.
  
  1769   Tuesday, August 28, 2018, 10:53 Travis CaveSouth Hot-CellStandard OperationTM4Ta#56Module move TM#4 with Ta#56 has been moved from
the east station to the south hot cell.
  
  1770   Tuesday, August 28, 2018, 14:19 David WangITEStandard OperationTM4Ta#56TM4 Ta#56 disconenction.TM4 has been disconnected in ITE this morning.
See attachment.
 TM4_Ta#56_disconnection..pdf 
  1771   Thursday, August 30, 2018, 07:42 David WangConditioning StationStandard OperationTM4 TM4 has been connected to TCS.TM4 has been connected to TCS. vacuum system
and water system are started. Everything
looks fine.
  
  1772   Thursday, August 30, 2018, 07:46 David WangConditioning StationStandard OperationTM4 TM4 HS line leak check at TCS and SHC.Chad and I leak checked TM4 HS line after
UCx 24 is installed. No leak at 5xE-9atm.cc/sec. 
Today, I did helium pressure test on HS line
  
  1774   Thursday, August 30, 2018, 14:16 Travis CaveSouth Hot-CellStandard OperationTM4Ta#56, UC#24, and no targetElectrical Check Results of the electrical check with
the spent Ta#56 attached, no target attached
and the UC#24 attached. These test were performed
 TM#4_Ta#56_Electrical_Check_Post_Beam_at_SHC.pdfTM#4_No_Target_Electrical_Check_Aug-29-2018.pdfTM#4_UC#24_Electrical_Check_SHC.pdf 
  1775   Tuesday, September 04, 2018, 08:18 David WangConditioning StationStandard OperationTM4UCx 24#Stppped TM4 and TCS vacuum and water system at TCS.I stopped TM4 and TCS vacuum system at
TCS. TCS and TM4 is venting with argon now.
  
  1776   Tuesday, September 04, 2018, 09:57 Travis CaveConditioning StationStandard OperationTM4UC#24Module move TM#4 with UC#24 has been moved from
the conditioning station to the east target
station.
  
  1778   Friday, September 07, 2018, 10:47 David WangITERepairTM4UCx24TM4 TP2 replacementTM4 TP2 could not be started  after
module was connected back to ITE on Sep 04th.
It was replaced with a new pump on Sep 05th.
  
  1779   Friday, September 07, 2018, 10:55 David WangITEStandard OperationTM4UCx 24#TM4 has been connected to ITE/ ChecklistTM4 has been connected to ITE on Sep 04th.
See attachment  for checklist.
 TM4_UCx_24#__connection_check_list.pdf 
  1797   Tuesday, October 02, 2018, 09:49 David WangITEStandard OperationTM4UCx 24#TM4 was disconnected in ITE.TM4 was disconnected in ITE yesterday.
See attachment for checklist.
 TM2_UCx_24#_disconnection_in_ITE..pdf 
  1798   Tuesday, October 02, 2018, 09:59 Travis CaveSouth Hot-CellStandard OperationTM4UC#24Module move TM#4 with UC#24 has been moved from
the east target station to the south hot
cell.
  
  1799   Wednesday, October 03, 2018, 14:16 David WangSouth Hot-CellStandard OperationTM4Ta #57Leak check TM4 Lp Ta# 57 at SHC.Tried to leak check TM4 Ta57# at TCS. LD
failed to pump down properly at fine range.
It always tripped at 4 torr. I cheeked all
  
  1801   Tuesday, October 09, 2018, 12:32 David WangConditioning StationRepairTM4 TM4 steers 4 pin feedthrough CF flangeTM4 Steers 4 pin feedthrough CF flange
is replaced due an inside feed through insulator
broken. CF 25 cooper seal is replaced with
  
  1802   Tuesday, October 09, 2018, 13:46 Travis CaveITEStandard OperationTM4Ta#57Module move TM#4 with Ta#57 has been moved from
the conditioning station to the east target
station.
  
  1803   Wednesday, October 10, 2018, 07:52 David WangITEStandard OperationTM4Ta#57TM4 has been connected in ITE.TM4 has been connected in ITE. see attachment.  TM4_with_TA#56_connection_in_ITE.pdf 
  1804   Wednesday, October 10, 2018, 10:50 Travis CaveConditioning StationStandard OperationTM4Ta#57Electrical Check The various electrical check done
on TM#4 after the UC run and before the start
of the Ta run.
 TM#4_UC#24_Electrical_Check_SHC.pdfTM#4_Elec_Chk_No_Target_Oct-3-2018.pdfTM#4_Elec_Chk_SHC_Ta#57.pdf 