Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
RH-ISAC
Not logged in
List
Message ID:
1775
Entry time:
Tuesday, September 04, 2018, 08:18
Author:
David Wang
Category:
Conditioning Station
Type:
Standard Operation
Module:
TM4
Target/Number:
UCx 24#
Subject:
Stppped TM4 and TCS vacuum and water system at TCS.
I stopped TM4 and TCS vacuum system at TCS. TCS and TM4 is venting with argon now.
ELOG V2.9.2-2455