Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1779     Entry time: Friday, September 07, 2018, 10:55
Author: David Wang 
Category: ITE 
Type: Standard Operation 
Module: TM4 
Target/Number: UCx 24# 
Subject: TM4 has been connected to ITE/ Checklist 

TM4 has been connected to ITE on Sep 04th. See attachment  for checklist.

Attachment 1: TM4_UCx_24#__connection_check_list.pdf  423 kB  | Show | Hide all
ELOG V2.9.2-2455