  301   Wednesday, April 17, 2013, 09:26 Travis CaveSouth Hot-CellStandard OperationTM3no targetElectrical checkElectrical check was performed on TM#3
with no target nothing was wrong was found,
but our megger does not go above 1000 volts
 TM3_DLB_9_PIN_CONN_ID_and_CHK.PDFTM3_Elec_CHK_no_target.PDF 
  303   Wednesday, April 17, 2013, 10:59 Travis CaveConditioning StationStandard OperationTM3no targetmodule moveTM#3 with no target has been moved from
the south hot cell to the conditioning station.
Move went well. The fields around the module
  
  319   Wednesday, April 24, 2013, 10:14 Travis CaveSouth Hot-CellStandard OperationTM3no targetmodule moveTM#3 has been moved from the conditioning
station to the south hot cell, move went
well.
  
  337   Friday, May 10, 2013, 11:02 Travis CaveSouth Hot-CellStandard OperationTM3no targetmodule moveTM#3 with no target and no source tray
has been moved from the south hot cell to
the conditioning station.
  
  338   Friday, May 10, 2013, 11:11 Travis CaveSouth Hot-CellStandard OperationTM3no targetElectrical checkTM#3 electrical check with no target and
no source tray, see pdf.
 TM#3_elec_chk_no_tgt_no_tray.PDF 
  352   Friday, May 17, 2013, 12:02 Travis CaveConditioning StationStandard OperationTM3 module moveTM#3 with no target or source trays has
been moved from the conditioning station
to the NE silo.
  
  353   Tuesday, May 21, 2013, 11:38 Travis CaveITEStandard OperationTM4SiC#28 (RFQ Target)module moveTM#3 with SiC#28 (RFQ Target) has been
moved from the east target station to the
south west silo.
  
  355   Wednesday, May 22, 2013, 10:41 Travis CaveSouth Hot-CellStandard OperationTM4SiC#28 (RFQ Target)module moveTM#4 with SiC#28 has been moved from the
south west silo to the south hot cell.
  
  357   Thursday, May 23, 2013, 09:51 Travis CaveConditioning StationStandard OperationTM4Ta#40module moveTM#4 with Ta#40 has been moved from the
south hot cell to the conditioning station.
  
  369   Tuesday, May 28, 2013, 10:37 Travis CaveITEStandard OperationTM4Ta#40module moveTM#4 with Ta #40 moved from the conditioning
station to the east target station, move
went well.
  
  370   Tuesday, May 28, 2013, 10:42 Travis CaveSouth Hot-CellStandard OperationTM4Ta#40Electrical checkResults of the electrical check on 
TM#4 with Ta#40, it passed. See attached
PDF for results.
 TM#4_Ta#40_SIS_Target_Elec_Chk.PDF 
  373   Friday, May 31, 2013, 11:19 Travis CaveSpent Target VaultStandard Operation SiC#28 (RFQ Target)Spent target moveSpent target SiC#28 (RFQ Target) has been
moved from the south hot to the storage vault.
The target was placed in pail #105 in spot
 Vault_Storage_May_31_2013.pdf 
  377   Wednesday, June 12, 2013, 10:39 Travis CaveSouth Hot-CellStandard Operation  spent source tray removalThe spent source tray for TM#3 has been
removed from the south hot cell and well
be placed in the the hot cell ante room.
  
  382   Thursday, June 20, 2013, 13:47 Travis CaveSpent Target VaultStandard Operation  Spent Target AssayTen targets have been assayed or had field
measurements(they were too hot to ship but
were assayed the last time an assay was done)
 Vault_Storage_June_20_2013.pdf 
  384   Tuesday, June 25, 2013, 13:20 Travis CaveSouth Hot-CellStandard OperationTM1UC#6Electrical checkResults from the electrical check of TM#1
with the UC#6 target. See attached PDF.
 TM#1_UC#6_SIS_Target_Elec_Chk.PDF 
  385   Tuesday, June 25, 2013, 14:24 Travis CaveConditioning StationStandard OperationTM1UC#6module moveModule moves of TM#1 with Ta#39 from ITW
to SHC then TM#1 with UCx#6 from SHC to the
conditioning station moves went well.
  
  392   Tuesday, July 02, 2013, 10:58 Travis CaveConditioning StationStandard OperationTM1UC#6module moveTM#1 with UC#6 has been moved from the
conditioning station to the west target station,
move went well.
  
  395   Wednesday, July 03, 2013, 10:43 Travis CaveSouth Hot-CellStandard OperationTM3no targetmodule moveTM#3 with no target and no source tray
was moved from the north east silo to the
south hot cell the move went well.
  
  403   Thursday, July 18, 2013, 10:08 Travis CaveConditioning StationStandard OperationTM3no targetmodule moveTM#3 with no target and no source tray
has been moved from the conditioning station
to the north east silo, move went well.
  
  405   Tuesday, July 23, 2013, 10:55 Travis CaveITEStandard OperationTM4Ta#40module moveTM#4 with Ta#40 has been moved from the
east target station to the south hot cell
move went well.
  