ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
Text |
 |
|
277
|
Monday, March 25, 2013, 14:19 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | CS Test Target #1 | module move | TM#4 with the CS Test target has been moved
from the conditioning station to the south
hot cell. Move went well. |
|
|
278
|
Tuesday, March 26, 2013, 14:17 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | SiC#28 (RFQ Target) | Electrical check | Electrical check of TM#4 SiC#28 (RFQ Target)
has been completed. It passed the standard
electrical checks for the target part, but |
|
|
279
|
Wednesday, March 27, 2013, 10:44 |
Travis Cave | ITE | Standard Operation | TM4 | SiC#28 (RFQ Target) | module move | TM#4 with SiC#28 has been moved from the
south hot cell to the east target station
move went well. |
|
|
283
|
Wednesday, April 03, 2013, 10:59 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | no target | module move | TM#1 has been moved from the south west
silo to the south hot cell, move went well. |
|
|
286
|
Wednesday, April 03, 2013, 14:39 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | Ta#39 | Electrical check | Electrical check on TM#1 with Ta#39 installed
at the south hot cell. Target passed the
electrical checks, see attached pdf for details. |
|
|
287
|
Thursday, April 04, 2013, 11:06 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | Ta#39 | module move | TM#1 with Ta#39 has been moved from the
south hot cell to the conditioning station
move went well. |
|
|
290
|
Monday, April 08, 2013, 09:01 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | Ta#39 | Electrical check | TM#1 with Ta#39 at the conditioning station,
has failed its electrical test see attached
pdf for details. Also while setting up for |
|
|
291
|
Monday, April 08, 2013, 12:10 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | Ta#39 | Electrical check | TM#1 with Ta#39 had the electrical check
done on it again it passed, changes this
time were the water lines were purged and |
|
|
293
|
Tuesday, April 09, 2013, 09:06 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | Ta#39 | Electrical check | TM#1 with Ta#39 has not passed it electrical
check again, while sitting at the conditioning
station at air. The readings have not been |
  |
|
298
|
Tuesday, April 16, 2013, 11:10 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | no target | module move | TM#3 has been moved from the NE Silo to
the south hot cell, move went well. |
|
|
301
|
Wednesday, April 17, 2013, 09:26 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | no target | Electrical check | Electrical check was performed on TM#3
with no target nothing was wrong was found,
but our megger does not go above 1000 volts |
 |
|
303
|
Wednesday, April 17, 2013, 10:59 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | no target | module move | TM#3 with no target has been moved from
the south hot cell to the conditioning station.
Move went well. The fields around the module |
|
|
319
|
Wednesday, April 24, 2013, 10:14 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | no target | module move | TM#3 has been moved from the conditioning
station to the south hot cell, move went
well. |
|
|
337
|
Friday, May 10, 2013, 11:02 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | no target | module move | TM#3 with no target and no source tray
has been moved from the south hot cell to
the conditioning station. |
|
|
338
|
Friday, May 10, 2013, 11:11 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | no target | Electrical check | TM#3 electrical check with no target and
no source tray, see pdf. |
|
|
352
|
Friday, May 17, 2013, 12:02 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | | module move | TM#3 with no target or source trays has
been moved from the conditioning station
to the NE silo. |
|
|
353
|
Tuesday, May 21, 2013, 11:38 |
Travis Cave | ITE | Standard Operation | TM4 | SiC#28 (RFQ Target) | module move | TM#3 with SiC#28 (RFQ Target) has been
moved from the east target station to the
south west silo. |
|
|
355
|
Wednesday, May 22, 2013, 10:41 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | SiC#28 (RFQ Target) | module move | TM#4 with SiC#28 has been moved from the
south west silo to the south hot cell. |
|
|
357
|
Thursday, May 23, 2013, 09:51 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | Ta#40 | module move | TM#4 with Ta#40 has been moved from the
south hot cell to the conditioning station. |
|
|
369
|
Tuesday, May 28, 2013, 10:37 |
Travis Cave | ITE | Standard Operation | TM4 | Ta#40 | module move | TM#4 with Ta #40 moved from the conditioning
station to the east target station, move
went well. |
|