  283   Wednesday, April 03, 2013, 10:59 Travis CaveSouth Hot-CellStandard OperationTM1no targetmodule move

TM#1 has been moved from the south west silo to the south hot cell, move went well.

  286   Wednesday, April 03, 2013, 14:39 Travis CaveSouth Hot-CellStandard OperationTM1Ta#39Electrical check

Electrical check on TM#1 with Ta#39 installed at the south hot cell. Target passed the electrical checks, see attached pdf for details.

Attachment 1: TM1_Ta39_SHC_ELEC_CHK.PDF
TM1_Ta39_SHC_ELEC_CHK.PDF
  287   Thursday, April 04, 2013, 11:06 Travis CaveSouth Hot-CellStandard OperationTM1Ta#39module move

TM#1 with Ta#39 has been moved from the south hot cell to the conditioning station move went well.

  290   Monday, April 08, 2013, 09:01 Travis CaveConditioning StationStandard OperationTM1Ta#39Electrical check

TM#1 with Ta#39 at the conditioning station, has failed its electrical test see attached pdf for details. Also while setting up for the electrical test one of the high powered flexible connectors popped out its crimp and another is working it out its crimp.

Attachment 1: TM1_Ta39_CS_ELEC_CHK.PDF
TM1_Ta39_CS_ELEC_CHK.PDF
  291   Monday, April 08, 2013, 12:10 Travis CaveConditioning StationStandard OperationTM1Ta#39Electrical check

TM#1 with Ta#39 had the electrical check done on it again it passed, changes this time were the water lines were purged and it was under a better then roughing vacuum. See the attached pdf for details.

Attachment 1: TM1_Ta39_CS_ELEC_CHK2.PDF
TM1_Ta39_CS_ELEC_CHK2.PDF
  293   Tuesday, April 09, 2013, 09:06 Travis CaveConditioning StationStandard OperationTM1Ta#39Electrical check

TM#1 with Ta#39 has not passed it electrical check again, while sitting at the conditioning station at air. The readings have not been consistant. See the current PDF for details.

 

TM#1 with Ta#39 electrical check at the target station see attached PDF (CHK 4).(April 9th 2013) PASSED

TM#1 with Ta#39 electrical check at the target station see attached PDF (CHK 5).(April 10th 2013) PASSED

Attachment 1: TM1_Ta39_CS_ELEC_CHK3.PDF
TM1_Ta39_CS_ELEC_CHK3.PDF
Attachment 2: TM1_Ta39_CS_ELEC_CHK4.PDF
TM1_Ta39_CS_ELEC_CHK4.PDF
Attachment 3: TM1_Ta39_CS_ELEC_CHK5.PDF
TM1_Ta39_CS_ELEC_CHK5.PDF
  298   Tuesday, April 16, 2013, 11:10 Travis CaveSouth Hot-CellStandard OperationTM3no targetmodule move

TM#3 has been moved from the NE Silo to the south hot cell, move went well.

  301   Wednesday, April 17, 2013, 09:26 Travis CaveSouth Hot-CellStandard OperationTM3no targetElectrical check

Electrical check was performed on TM#3 with no target nothing was wrong was found, but our megger does not go above 1000 volts so any problems above this value would not be seen, see attached pdf for details.

Also the 55 pin(top) double 9 pin (bottom) connector was tested as well. When it was meggered to 60kV common more then 50% of the lines failed, when those line were identified with a resistance package two were unable to be indentified. The wiring for this double 9 pin connector should be removed to prevent HV problems. New wiring is not physically possible to re-install in its place, see the PDF for the wiring details.

Attachment 1: TM3_DLB_9_PIN_CONN_ID_and_CHK.PDF
TM3_DLB_9_PIN_CONN_ID_and_CHK.PDF
Attachment 2: TM3_Elec_CHK_no_target.PDF
TM3_Elec_CHK_no_target.PDF
  303   Wednesday, April 17, 2013, 10:59 Travis CaveConditioning StationStandard OperationTM3no targetmodule move

TM#3 with no target has been moved from the south hot cell to the conditioning station. Move went well. The fields around the module was 1.6mSv/hr.

  319   Wednesday, April 24, 2013, 10:14 Travis CaveSouth Hot-CellStandard OperationTM3no targetmodule move

TM#3 has been moved from the conditioning station to the south hot cell, move went well.

  337   Friday, May 10, 2013, 11:02 Travis CaveSouth Hot-CellStandard OperationTM3no targetmodule move

TM#3 with no target and no source tray has been moved from the south hot cell to the conditioning station.

  338   Friday, May 10, 2013, 11:11 Travis CaveSouth Hot-CellStandard OperationTM3no targetElectrical check

TM#3 electrical check with no target and no source tray, see pdf.

Attachment 1: TM#3_elec_chk_no_tgt_no_tray.PDF
TM#3_elec_chk_no_tgt_no_tray.PDF
  352   Friday, May 17, 2013, 12:02 Travis CaveConditioning StationStandard OperationTM3 module move

TM#3 with no target or source trays has been moved from the conditioning station to the NE silo.

  353   Tuesday, May 21, 2013, 11:38 Travis CaveITEStandard OperationTM4SiC#28 (RFQ Target)module move

TM#3 with SiC#28 (RFQ Target) has been moved from the east target station to the south west silo.

  355   Wednesday, May 22, 2013, 10:41 Travis CaveSouth Hot-CellStandard OperationTM4SiC#28 (RFQ Target)module move

TM#4 with SiC#28 has been moved from the south west silo to the south hot cell.

  357   Thursday, May 23, 2013, 09:51 Travis CaveConditioning StationStandard OperationTM4Ta#40module move

TM#4 with Ta#40 has been moved from the south hot cell to the conditioning station.

  369   Tuesday, May 28, 2013, 10:37 Travis CaveITEStandard OperationTM4Ta#40module move

TM#4 with Ta #40 moved from the conditioning station to the east target station, move went well.

  370   Tuesday, May 28, 2013, 10:42 Travis CaveSouth Hot-CellStandard OperationTM4Ta#40Electrical check

Results of the electrical check on  TM#4 with Ta#40, it passed. See attached PDF for results.

Attachment 1: TM#4_Ta#40_SIS_Target_Elec_Chk.PDF
TM#4_Ta#40_SIS_Target_Elec_Chk.PDF
  373   Friday, May 31, 2013, 11:19 Travis CaveSpent Target VaultStandard Operation SiC#28 (RFQ Target)Spent target move

Spent target SiC#28 (RFQ Target) has been moved from the south hot to the storage vault. The target was placed in pail #105 in spot 2C of  the spent target vault. The target had a field of 24.8mSv/hr at about a meter upon removal from the south hot cell. See attached PDF for the status of the vault. It currently only has six free spots left.

Attachment 1: Vault_Storage_May_31_2013.pdf
Vault_Storage_May_31_2013.pdf Vault_Storage_May_31_2013.pdf Vault_Storage_May_31_2013.pdf Vault_Storage_May_31_2013.pdf
  377   Wednesday, June 12, 2013, 10:39 Travis CaveSouth Hot-CellStandard Operation  spent source tray removal

The spent source tray for TM#3 has been removed from the south hot cell and well be placed in the the hot cell ante room. To sit till maintenance day to be moved over to the vault storage tunnels.