  1752   Wednesday, July 11, 2018, 15:09 Anders MjosITWMaintenanceTM2Nb#8Uncovered ITW to toubleshoot 2A2M19The 2A2M19 beam profile monitor did not
work and was e-faulted.
After initial troubleshooting 2 blocks were
  
  752   Tuesday, September 23, 2014, 12:24 chad fisherSouth Hot-CellStandard OperationTM4Ta#44Ucx10 removed Ta#44 installedUcx#10 has been removed from TM4 and placed
in a pail with argon.
Ta#44 has been installed onto TM4
  
  388   Thursday, June 27, 2013, 14:21 chad fisherSouth Hot-CellStandard OperationTM1Ucx#6Ucx#6 installed Ta#39? rewmovedUcx#6 was installed on TM1 on Wednesday.
Ta#39 was removed.
  
  2146   Wednesday, September 23, 2020, 10:56 chad fisherSouth Hot-CellStandard OperationTM4UC#31 P2NUc#30 removed UC#31 P2N installedUCx#30 has been removed from TM#4 and put
in a can with argon. 5(10) pin connector
had to have guide screws removed to be uninstalled.
  
  170   Wednesday, September 05, 2012, 14:36 chad fisherSouth Hot-CellStandard OperationTM4NiO #1UOx removal NiO installationUOx was removed from TM4 yesterday and
NiO#1 installed.
Video was taken.
  
  1018   Monday, July 27, 2015, 17:03 David WangConditioning StationStandard OperationTM4UCx 13UCx13 and TM4 under vacuum at CS.I connected the CS  vacuum system 
to TM4. The CS and TM4 turbo pumps are started.
Everything is good so far. The HS line will
  
  704   Wednesday, July 16, 2014, 13:56 chad fisherSouth Hot-CellStandard OperationTM1UCx#9UCx#9 off Ta onThe UCx#9 target has been revomed from
the target module...leg A was broken as suspected.
Ta#42 has been installed. High current
  
  221   Tuesday, December 04, 2012, 14:20 chad fisherSouth Hot-CellStandard OperationTM4UCx#5UCx#5 RemovalUCx #5 has been removed from TM4. The left
oven leg is indeed broken.
Target has been placed in a pail
  
  2743   Wednesday, January 08, 2025, 07:37 chad fisherSouth Hot-CellStandard OperationTM4UCx#46UCx#46 removalUCx#46 removed from TM4 and placed into
a pail back-filled with argon. Nothing visually
unusual; no issues.
 TM4_UCx46_07012024.jpegTM4_UCx46_2_07012024.jpeg 
  2715   Friday, November 08, 2024, 10:44 Aaron TamSouth Hot-CellStandard OperationTM4UCx#46UCx#46 Install and Parasitic Target Status November 6, 2024 - Aaron Tam 
UCx#46 Target handover from
TPO 
 Left_side_Array_Parasitic_with_floppy_spacer.jfifRight_side_Window_Parasitic.jfifLid_Parasitics_order.jfif 
  2599   Friday, May 24, 2024, 08:10 chad fisherSouth Hot-CellStandard OperationTM4UCx#45UCx#45 InstallationOn Wednesday, May 22, 2024 UCx#45 was installed
on TM4 in the SHC. Installation was normal
other then minor issue with the multipin
  
  2519   Wednesday, January 10, 2024, 16:51 Carla BabcockITEStandard OperationTM4UCx#43UCx#43 failure To deliver stable beam to RadMol,
started heating UCx#43 up again. Target was
overheated during initial conditioning in
  
  2536   Friday, January 26, 2024, 16:48 Carla BabcockSouth Hot-CellStandard OperationTM4UC43UCx#43 PIEUCx#43 PIE was done in the SHC. As expected
based on electrical measurements, the target
container was broken on the right side and
  
  153   Tuesday, July 31, 2012, 12:24 chad fisherSouth Hot-CellStandard OperationTM1UCx#4UCx#4 InstalledStarting at 11:00 am and finishing at 12:10
Ucx#4 previous target was removed and UCx#4
installed and leak checked on TM1.
  
  2323   Thursday, May 19, 2022, 15:05 Frank SongITEStandard OperationTM4UCx#37UCx#37 P2N connection on TM4 TM4 with UCx#37 was connected in
ITE. Attachment available.
 01_UCx37_P2N_connection_on_TM4.jpg02_UCx37_P2N_connection_on_TM4.jpg03_UCx37_P2N_connection_on_TM4.jpg 
  2117   Friday, July 03, 2020, 08:46 chad fisherSouth Hot-CellStandard OperationTM4UcX#30UCx#30 installed onto tm4UCx#30 has been installed onto TM4 with
new high current fasteners torqued to 130
in lbs.
  
  77   Tuesday, March 13, 2012, 09:43 chad fisherSouth Hot-CellStandard OperationTM1UCx#3UCx#3 to spent vaultUCx#3 was packaged into a spent can, double
bagged and the bag and cans filled with argon
as much as possible. Lid was attached and
 Vault_Storage_March_13_2012.pdf 
  57   Friday, November 18, 2011, 09:56 chad fisherSouth Hot-CellStandard OperationTM1UCx#3UCx#3 InstallationUCx#3 has been installed on TM1.
Leak check also complete.
Base Leak Rate 0.0 x 10-9
  
  76   Tuesday, March 13, 2012, 09:42 chad fisherSouth Hot-CellStandard OperationTM1UCx#3UCx#3 AutopsyAn autopsy was performed on UCx#3 yesterday
afternoon. This autopsy followed the plan
written by Anders. Indeed, both sides of
  
  78   Tuesday, March 13, 2012, 12:24 Anders MjosSouth Hot-CellStandard OperationTM1UCx#3UCx#3 Autopsy

    

       
            
 Inspection_of_UCx#3_in_the_South_Hot_Cell.docx 