1279
|
Friday, July 08, 2016, 16:56 |
Anders Mjos | Conditioning Station | Repair | | | VFD21 OL1 fault on Chiller | Plant Services group (Tony) will contact
a service tech on Monday.
Water system will be switched off |
|
1286
|
Thursday, July 14, 2016, 13:25 |
Anders Mjos | Conditioning Station | Repair | | | VFD21 OL1 fault on Chiller |
|
|
1323
|
Thursday, August 18, 2016, 10:35 |
Anders Mjos | Conditioning Station | Repair | | | VFD21 OL1 fault on Chiller |
|
|
238
|
Friday, January 18, 2013, 16:56 |
Grant Minor | Conditioning Station | Standard Operation | TM4 | | VAT valve btwn roughing and nuc. vent. closed | Bevan attempted to start pumping down on
TM4 today remotely but there was an issue.
He will report on Monday. |
|
1561
|
Monday, June 19, 2017, 07:29 |
David Wang | Conditioning Station | Standard Operation | TM2 | | Update TH MS project schedule. | Update TH MS project schedule. See attachment
1,2. |
 |
1433
|
Friday, February 03, 2017, 11:49 |
David Wang | Conditioning Station | Standard Operation | | | Update 2017 winter shutdown TH schedule. | Update 2017 winter shut down target hall
schedule. See attachments |
 |
1752
|
Wednesday, July 11, 2018, 15:09 |
Anders Mjos | ITW | Maintenance | TM2 | Nb#8 | Uncovered ITW to toubleshoot 2A2M19 | The 2A2M19 beam profile monitor did not
work and was e-faulted.
After initial troubleshooting 2 blocks were |
|
752
|
Tuesday, September 23, 2014, 12:24 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | Ta#44 | Ucx10 removed Ta#44 installed | Ucx#10 has been removed from TM4 and placed
in a pail with argon.
Ta#44 has been installed onto TM4 |
|
388
|
Thursday, June 27, 2013, 14:21 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | Ucx#6 | Ucx#6 installed Ta#39? rewmoved | Ucx#6 was installed on TM1 on Wednesday.
Ta#39 was removed. |
|
2146
|
Wednesday, September 23, 2020, 10:56 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | UC#31 P2N | Uc#30 removed UC#31 P2N installed | UCx#30 has been removed from TM#4 and put
in a can with argon. 5(10) pin connector
had to have guide screws removed to be uninstalled. |
|
170
|
Wednesday, September 05, 2012, 14:36 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | NiO #1 | UOx removal NiO installation | UOx was removed from TM4 yesterday and
NiO#1 installed.
Video was taken. |
|
1018
|
Monday, July 27, 2015, 17:03 |
David Wang | Conditioning Station | Standard Operation | TM4 | UCx 13 | UCx13 and TM4 under vacuum at CS. | I connected the CS vacuum system
to TM4. The CS and TM4 turbo pumps are started.
Everything is good so far. The HS line will |
|
704
|
Wednesday, July 16, 2014, 13:56 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | UCx#9 | UCx#9 off Ta on | The UCx#9 target has been revomed from
the target module...leg A was broken as suspected.
Ta#42 has been installed. High current |
|
221
|
Tuesday, December 04, 2012, 14:20 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | UCx#5 | UCx#5 Removal | UCx #5 has been removed from TM4. The left
oven leg is indeed broken.
Target has been placed in a pail |
|
2743
|
Wednesday, January 08, 2025, 07:37 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | UCx#46 | UCx#46 removal | UCx#46 removed from TM4 and placed into
a pail back-filled with argon. Nothing visually
unusual; no issues. |
 |
2715
|
Friday, November 08, 2024, 10:44 |
Aaron Tam | South Hot-Cell | Standard Operation | TM4 | UCx#46 | UCx#46 Install and Parasitic Target Status | November 6, 2024 - Aaron Tam
UCx#46 Target handover from
TPO |
  |
2599
|
Friday, May 24, 2024, 08:10 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | UCx#45 | UCx#45 Installation | On Wednesday, May 22, 2024 UCx#45 was installed
on TM4 in the SHC. Installation was normal
other then minor issue with the multipin |
|
2519
|
Wednesday, January 10, 2024, 16:51 |
Carla Babcock | ITE | Standard Operation | TM4 | UCx#43 | UCx#43 failure | To deliver stable beam to RadMol,
started heating UCx#43 up again. Target was
overheated during initial conditioning in |
|
2536
|
Friday, January 26, 2024, 16:48 |
Carla Babcock | South Hot-Cell | Standard Operation | TM4 | UC43 | UCx#43 PIE | UCx#43 PIE was done in the SHC. As expected
based on electrical measurements, the target
container was broken on the right side and |
|
153
|
Tuesday, July 31, 2012, 12:24 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | UCx#4 | UCx#4 Installed | Starting at 11:00 am and finishing at 12:10
Ucx#4 previous target was removed and UCx#4
installed and leak checked on TM1. |
|