Entry  Wednesday, July 11, 2018, 15:09, Anders Mjos, ITW, Maintenance, TM2, Nb#8, Uncovered ITW to toubleshoot 2A2M19 

The 2A2M19 beam profile monitor did not work and was e-faulted. After initial troubleshooting 2 blocks were removed form ITW to inspect the entrance module where the beam monitor is installed. The cable was found not to be connected and was quickly fixed. Blocks reinstalled. The work was done by Maico, Travis and Anders

Entry  Tuesday, September 23, 2014, 12:24, chad fisher, South Hot-Cell, Standard Operation, TM4, Ta#44, Ucx10 removed Ta#44 installed 

Ucx#10 has been removed from TM4 and placed in a pail with argon.

Ta#44 has been installed onto TM4 and target heater bolts torqed to 130 in.lbs.

Entry  Thursday, June 27, 2013, 14:21, chad fisher, South Hot-Cell, Standard Operation, TM1, Ucx#6, Ucx#6 installed Ta#39? rewmoved 

Ucx#6 was installed on TM1 on Wednesday.

Ta#39 was removed.

Entry  Wednesday, September 23, 2020, 10:56, chad fisher, South Hot-Cell, Standard Operation, TM4, UC#31 P2N, Uc#30 removed UC#31 P2N installed 

UCx#30 has been removed from TM#4 and put in a can with argon. 5(10) pin connector had to have guide screws removed to be uninstalled.

UCx#31 P2N installed.

Entry  Wednesday, September 05, 2012, 14:36, chad fisher, South Hot-Cell, Standard Operation, TM4, NiO #1, UOx removal NiO installation 

UOx was removed from TM4 yesterday and NiO#1 installed.

Video was taken.

Main stand-off insulators continue to deteriorate.

Entry  Monday, July 27, 2015, 17:03, David Wang, Conditioning Station, Standard Operation, TM4, UCx 13, UCx13 and TM4 under vacuum at CS. 

I connected the CS  vacuum system  to TM4. The CS and TM4 turbo pumps are started. Everything is good so far. The HS line will be pressured with helium tomorrow for leak checking. The CS and TM4 will be vented with Argon on Wednesday morning as planned before moved to ITE.

Entry  Wednesday, July 16, 2014, 13:56, chad fisher, South Hot-Cell, Standard Operation, TM1, UCx#9, UCx#9 off Ta on 

The UCx#9 target has been revomed from the target module...leg A was broken as suspected.

Ta#42 has been installed. High current connection fasteners torqued to 150 in lbs.

Entry  Tuesday, December 04, 2012, 14:20, chad fisher, South Hot-Cell, Standard Operation, TM4, UCx#5, UCx#5 Removal 

UCx #5 has been removed from TM4. The left oven leg is indeed broken.

Target has been placed in a pail with an argon feed.

Entry  Wednesday, January 08, 2025, 07:37, chad fisher, South Hot-Cell, Standard Operation, TM4, UCx#46, UCx#46 removal TM4_UCx46_07012024.jpegTM4_UCx46_2_07012024.jpeg

UCx#46 removed from TM4 and placed into a pail back-filled with argon. Nothing visually unusual; no issues.

Entry  Friday, November 08, 2024, 10:44, Aaron Tam, South Hot-Cell, Standard Operation, TM4, UCx#46, UCx#46 Install and Parasitic Target Status  Left_side_Array_Parasitic_with_floppy_spacer.jfifRight_side_Window_Parasitic.jfifLid_Parasitics_order.jfif

November 6, 2024 - Aaron Tam 

UCx#46 Target handover from TPO 

Target insertion: successful 

Parasitic Install: All Parasitic targets left off target

  • Left side In-beam array type parasitic install attempt #1 
    • Parasitic assembly is too thin/studs too tall for the socket nut to fasten onto target. Stud protrudes through the length of socket section, not allowing tool to insert 
    • previously a 3/4 spacer was used to give space for thermal couple to enter 
    • Install of 3/4 spacer was difficult because it does not hold its shape when handled (pivots around 1/2 ad 1/4 portions) 
    • With spacer installed, parasitic assembly is too thick for socket nuts to fasten onto studs. 
      • It may have been possible to back out studs to use, but left off in the interest of time UCx is exposed. 
  • Right side In-beam window type parasitic install
    • Similarly to Left side, studs were too short for install, studs could be backed out, but was left off in the interest of time UCx exposed
  • PEEK seal parasitic targets were left off as per schedule, and will be leak checked at another date (after tong cable has been repaired) 
    • Order of PEEK seal locations preserved and follows order as seen with target installed (Photo attached)

Target install: successful 

Leak Check: Successful 

Electrical Check: Successful 

  • Initially failed due to wiring diagram being different between production wiring diagram and electrical test sheet

Containment box panel closed 

 

 

Entry  Friday, May 24, 2024, 08:10, chad fisher, South Hot-Cell, Standard Operation, TM4, UCx#45, UCx#45 Installation 

On Wednesday, May 22, 2024 UCx#45 was installed on TM4 in the SHC. Installation was normal other then minor issue with the multipin connector drive screw not engaging and/or driving properly. This was remedied by loosening the left guide bolt slightly (1/2 turn). After loosening the multipin drove in and seated correctly (verified by camera). High current fasteners torqued to 130 in lbs.

Entry  Wednesday, January 10, 2024, 16:51, Carla Babcock, ITE, Standard Operation, TM4, UCx#43, UCx#43 failure 

 To deliver stable beam to RadMol, started heating UCx#43 up again. Target was overheated during initial conditioning in Nov but then ran well for 4 weeks. During the run time, the TGHT voltage jumped around and this was reflected in the ion current, but yields seemed unaffected.

When re-heating it, the TGHT voltage was very unstable and once it got to 440A, it went into voltage limiting mode. We ramped down and it was still voltage limiting, but turning things off solved it. We ramped back up and it did about the same thing. TBHT voltage and current remained steady. Looks like a heat generated issue.

Measured the resistance in the lines from the electrical room. Resistance of the lines to ITE should be 1.19mOhms for TGHT and 1.95mOhms for TBHT. TBHT positive to negative had a resistance of 7.9mOhms from the electrical room today, and 5.7mOhms on module top when measured Nov. 8. This seems to track.

TGHT positive to negative was measured at 27.6mOhms today (and was jumping around), whereas it was 7.14m Ohms on Nov. 8.

10V @ 440A is 22.7mOhms, so it makes sense that it limited. Tried with increased voltage (up to limit of 16V) but this didn't help. Declared the target dead on Jan. 11.

 

David measured resistances on the module top and found (in mOhms):

A-B = 27 (TGHT)

A-C = 7.473

A-D = 6.380

B-C = 26.053

B-D = 25.569

C-D = 5.212 (TBHT)

 

So looks like the tube is broken on the B side.

Entry  Friday, January 26, 2024, 16:48, Carla Babcock, South Hot-Cell, Standard Operation, TM4, UC43, UCx#43 PIE 

UCx#43 PIE was done in the SHC. As expected based on electrical measurements, the target container was broken on the right side and came off easily. Despite all the black stuff seen on the containment box and source tray, the inside of the heat shield was very clean. Checked if the Re foil was curled in and didn't see anything. Looked fine other than the broken container.

Entry  Tuesday, July 31, 2012, 12:24, chad fisher, South Hot-Cell, Standard Operation, TM1, UCx#4, UCx#4 Installed 

Starting at 11:00 am and finishing at 12:10 Ucx#4 previous target was removed and UCx#4 installed and leak checked on TM1.

During module move to the hot cell UCx#4 was housed in a bag under argon.

Entry  Thursday, May 19, 2022, 15:05, Frank Song, ITE, Standard Operation, TM4, UCx#37, UCx#37 P2N connection on TM4 01_UCx37_P2N_connection_on_TM4.jpg02_UCx37_P2N_connection_on_TM4.jpg03_UCx37_P2N_connection_on_TM4.jpg

 TM4 with UCx#37 was connected in ITE. Attachment available.

Entry  Friday, July 03, 2020, 08:46, chad fisher, South Hot-Cell, Standard Operation, TM4, UcX#30, UCx#30 installed onto tm4 

UCx#30 has been installed onto TM4 with new high current fasteners torqued to 130 in lbs.

Entry  Tuesday, March 13, 2012, 09:43, chad fisher, South Hot-Cell, Standard Operation, TM1, UCx#3, UCx#3 to spent vault Vault_Storage_March_13_2012.pdf

UCx#3 was packaged into a spent can, double bagged and the bag and cans filled with argon as much as possible. Lid was attached and can moved to the storage vault. The target was placed in in Pail 93, and placed into slot 1C of the vault, it was 11.7mSv/hr when removed from the south hot cell. See attached file for latest vault details

Entry  Friday, November 18, 2011, 09:56, chad fisher, South Hot-Cell, Standard Operation, TM1, UCx#3, UCx#3 Installation 

UCx#3 has been installed on TM1.

Leak check also complete.

Base Leak Rate 0.0 x 10-9

Pressure 0.0x10-4

Two checks on upper heat shield joint - no response (2 sec spray/check)

Two checks on lower heat shield joint - no response(2 sec spray /check)

10 sec flood of all heat shield joints - no response

Electrical check coomplete.

Entry  Tuesday, March 13, 2012, 09:42, chad fisher, South Hot-Cell, Standard Operation, TM1, UCx#3, UCx#3 Autopsy 

An autopsy was performed on UCx#3 yesterday afternoon. This autopsy followed the plan written by Anders. Indeed, both sides of the target oven had seperated from the central block.Pictures were taken by Anders and Pierre.

After the disection the target was placed back in a can under argon. Any small piece were placed in a zip lock bag and also put in the can under argon.

    Reply  Tuesday, March 13, 2012, 12:24, Anders Mjos, South Hot-Cell, Standard Operation, TM1, UCx#3, UCx#3 Autopsy Inspection_of_UCx#3_in_the_South_Hot_Cell.docx

chad fisher wrote:

An autopsy was performed on UCx#3 yesterday afternoon. This autopsy followed the plan written by Anders. Indeed, both sides of the target oven had seperated from the central block.Pictures were taken by Anders and Pierre.

After the disection the target was placed back in a can under argon. Any small piece were placed in a zip lock bag and also put in the can under argon.

Pictures are available on DocuShare:

https://documents.triumf.ca/docushare/dsweb/View/Collection-8189

ISAC e-log entries:

https://web.accel.triumf.ca/isac_elog/Elog_shift_view.pl?shiftid=10803

See attachment for autopsy plan.

 

 

ELOG V2.9.2-2455