Entry  Friday, December 18, 2015, 11:42, Anders Mjos, Conditioning Station, Repair, , , Vacuum gauges not reading correctly 
 It was found that the conversion from voltage to vacuum (Torr) in EPICS is not correct for the XGS-600 controllers in use at the TCS. EPICS did
not correspond to local values displayed on the controller. An e-fault has been submitted.
    Reply  Monday, December 21, 2015, 13:27, Anders Mjos, Conditioning Station, Repair, , , Vacuum gauges not reading correctly 


    
        
            Anders Mjos wrote:
        
        
            
             It was found that the conversion from voltage to vacuum (Torr) in EPICS is not correct for the
Entry  Friday, September 11, 2015, 14:31, Anders Mjos, Conditioning Station, Maintenance, TM2, ZrC#7, Vacuum gauge and EPICS read back calibration 
The corelation betwenn the local value on the gauge controllers and the read back valiues in EPICS was compared. Data can be found in a previous  e-log
Entry  Monday, September 30, 2013, 16:02, Bevan Moss, Conditioning Station, Standard Operation, TM3, NiO#2, Vacuum 
 The roughing pump for TCS was started at ~3:00 and the turbo's turned on at ~4:00. This is the minimum time for the module to pump down.
Entry  Friday, July 08, 2016, 16:56, Anders Mjos, Conditioning Station, Repair, , , VFD21 OL1 fault on Chiller 
Plant Services group (Tony) will contact a service tech on Monday.
Water system will be switched off over the weekend.
    Reply  Thursday, July 14, 2016, 13:25, Anders Mjos, Conditioning Station, Repair, , , VFD21 OL1 fault on Chiller 


    
        
            Anders Mjos wrote:
        
        
            
            Plant Services group (Tony) will contact a service tech on Monday.
    Reply  Thursday, August 18, 2016, 10:35, Anders Mjos, Conditioning Station, Repair, , , VFD21 OL1 fault on Chiller 


    
        
            Anders Mjos wrote:
        
        
            
            
            
Entry  Friday, January 18, 2013, 16:56, Grant Minor, Conditioning Station, Standard Operation, TM4, , VAT valve btwn roughing and nuc. vent. closed 
Bevan attempted to start pumping down on TM4 today remotely but there was an issue.  He will report on Monday.
I went into the Target Hall this afternoon while on the phone with Bevan and performed the following:
- Checked the knurled vent valves on the side of each turbo, both were found to be in the tightened position (all the way clockwise)
Entry  Monday, June 19, 2017, 07:29, David Wang, Conditioning Station, Standard Operation, TM2, , Update TH MS project schedule. Target_Hall_shedule_132_Apr_to_Sep.pdfTarget_Hall_shedule_132_Apr_to_Sep.mpp
Update TH MS project schedule. See attachment 1,2. 
Entry  Friday, February 03, 2017, 11:49, David Wang, Conditioning Station, Standard Operation, , , Update 2017 winter shutdown TH schedule. 2017_Winter_Shut_Down_Target_Hall_Schedule.mpp2017_Winter_Shut_Down_Target_Hall_Schedule.pdf
Update 2017 winter shut down target hall schedule. See attachments
Entry  Wednesday, July 11, 2018, 15:09, Anders Mjos, ITW, Maintenance, TM2, Nb#8, Uncovered ITW to toubleshoot 2A2M19 
The 2A2M19 beam profile monitor did not work and was e-faulted.
After initial troubleshooting 2 blocks were removed form ITW to inspect the entrance module where the beam monitor is installed. The cable was found not
to be connected and was quickly fixed. Blocks reinstalled. The work was done by Maico, Travis and Anders
Entry  Tuesday, September 23, 2014, 12:24, chad fisher, South Hot-Cell, Standard Operation, TM4, Ta#44, Ucx10 removed Ta#44 installed 
Ucx#10 has been removed from TM4 and placed in a pail with argon.
Ta#44 has been installed onto TM4 and target heater bolts torqed to 130 in.lbs.
Entry  Thursday, June 27, 2013, 14:21, chad fisher, South Hot-Cell, Standard Operation, TM1, Ucx#6, Ucx#6 installed Ta#39? rewmoved 
Ucx#6 was installed on TM1 on Wednesday.
Ta#39 was removed.
Entry  Wednesday, September 23, 2020, 10:56, chad fisher, South Hot-Cell, Standard Operation, TM4, UC#31 P2N, Uc#30 removed UC#31 P2N installed 
UCx#30 has been removed from TM#4 and put in a can with argon. 5(10) pin connector had to have guide screws removed to be uninstalled.
UCx#31 P2N installed.
Entry  Wednesday, September 05, 2012, 14:36, chad fisher, South Hot-Cell, Standard Operation, TM4, NiO #1, UOx removal NiO installation 
UOx was removed from TM4 yesterday and NiO#1 installed.
Video was taken.
Main stand-off insulators continue to deteriorate.
Entry  Monday, July 27, 2015, 17:03, David Wang, Conditioning Station, Standard Operation, TM4, UCx 13, UCx13 and TM4 under vacuum at CS. 
I connected the CS  vacuum system  to TM4. The CS and TM4 turbo pumps are started. Everything is good so far. The HS line will be pressured
with helium tomorrow for leak checking. The CS and TM4 will be vented with Argon on Wednesday morning as planned before moved to ITE.
Entry  Wednesday, July 16, 2014, 13:56, chad fisher, South Hot-Cell, Standard Operation, TM1, UCx#9, UCx#9 off Ta on 
The UCx#9 target has been revomed from the target module...leg A was broken as suspected.
Ta#42 has been installed. High current connection fasteners torqued to 150 in lbs.
Entry  Tuesday, December 04, 2012, 14:20, chad fisher, South Hot-Cell, Standard Operation, TM4, UCx#5, UCx#5 Removal 
UCx #5 has been removed from TM4. The left oven leg is indeed broken.
Target has been placed in a pail with an argon feed.
Entry  Wednesday, January 08, 2025, 07:37, chad fisher, South Hot-Cell, Standard Operation, TM4, UCx#46, UCx#46 removal TM4_UCx46_07012024.jpegTM4_UCx46_2_07012024.jpeg
UCx#46 removed from TM4 and placed into a pail back-filled with argon. Nothing visually unusual; no issues.
Entry  Friday, November 08, 2024, 10:44, Aaron Tam, South Hot-Cell, Standard Operation, TM4, UCx#46, UCx#46 Install and Parasitic Target Status  Left_side_Array_Parasitic_with_floppy_spacer.jfifRight_side_Window_Parasitic.jfifLid_Parasitics_order.jfif
November 6, 2024 - Aaron Tam 
UCx#46 Target handover from TPO 
Target insertion: successful 