1779
|
Friday, September 07, 2018, 10:55 |
David Wang | ITE | Standard Operation | TM4 | UCx 24# | TM4 has been connected to ITE/ Checklist | TM4 has been connected to ITE on Sep 04th.
See attachment for checklist. |
|
1797
|
Tuesday, October 02, 2018, 09:49 |
David Wang | ITE | Standard Operation | TM4 | UCx 24# | TM4 was disconnected in ITE. | TM4 was disconnected in ITE yesterday.
See attachment for checklist. |
|
1018
|
Monday, July 27, 2015, 17:03 |
David Wang | Conditioning Station | Standard Operation | TM4 | UCx 13 | UCx13 and TM4 under vacuum at CS. | I connected the CS vacuum system
to TM4. The CS and TM4 turbo pumps are started.
Everything is good so far. The HS line will |
|
1019
|
Tuesday, July 28, 2015, 10:12 |
David Wang | Conditioning Station | Standard Operation | TM4 | UCx 13 | Helium pressure test on TM4 HS line at CS | I did the helium pressure test on TM4 HS
line at CS. Applied 70 psi helium 2
minutes. base leak rate0.0x E-9 atm.cc/sec. |
|
1024
|
Wednesday, July 29, 2015, 06:24 |
David Wang | Conditioning Station | Standard Operation | TM4 | UCx 13 | Stopped the CS and TM4 pumps and vent with argon. | Dan and I stopped the CS and TM4 pumps.
We are venting the CS with argon for UCX13
target. |
|
1068
|
Tuesday, September 15, 2015, 08:24 |
David Wang | South Hot-Cell | Repair | TM1 | UCx 13 | Leak check on TM1 window circuit soldering stems in service cap. | I did a leak check on TM1 window circuit
2 soldering stems in service cap.The
round side panel was opened for the job. |
|
1146
|
Tuesday, December 01, 2015, 14:30 |
David Wang | ITE | Standard Operation | TM4 | UCx 13 | TM4 has been connected in ITE | TM4 has been connected in ITE. All turbo-pumps
are started. Everything is good so far. |
|
671
|
Monday, June 02, 2014, 11:25 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | UCx #9 | UCx #9 Installed | UCx #9 has been installed. |
|
2742
|
Tuesday, January 07, 2025, 12:05 |
David Wang | ITE | Standard Operation | TM3 | UCx #47 | ITE primary and secondary vacuum vessel leak check for 2025 shut down | ITE primary and secondary vacuum vessel
leak check for 2025 shut down have been done.
No leak. The TM3 waterlines helium |
|
2307
|
Thursday, February 17, 2022, 13:24 |
David Wang | Spent Target Vault | Maintenance | | UCx #34 | Repackage of UCx #34in NHC. | UCX34# in pail 258(Vault lot 7C) has been
repacked today. It is an investigation to
find a possible leak source of radioactive |
|
61
|
Tuesday, November 22, 2011, 15:07 |
Bevan Moss | Conditioning Station | Standard Operation | TM1 | UCx #3 | HV testing | High Voltage (HV) testing was completed
on TM1 today. Vacuum was very good 1.9 x
10^-7 T in the service cap, 3.2 x 10^-7 in |
|
20
|
Thursday, August 18, 2011, 13:12 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | UCx #2 | UCx #2 Installation | UCx #2 has been installed onto TM1.
Installation went well except the
left leg got bent slightly sometime between |
|
726
|
Thursday, August 07, 2014, 13:58 |
David Wang | South Hot-Cell | Standard Operation | TM4 | UCx #10 | Leak check on TM4 HS water line with new UCX target. | Isaac and I leak checked TM4 HS line with
new UCX target. The leak detector base LR
0.0xE-9 atm.cc/sec, base pressure0.0xE-4torr. |
|
727
|
Thursday, August 07, 2014, 17:07 |
David Wang | Conditioning Station | Standard Operation | TM4 | UCx #10 | TM4 is connected in CS. | TM4 is connected at CS. All turbo pumps
are started. The pumping down is good so
far. |
|
728
|
Friday, August 08, 2014, 08:47 |
David Wang | Conditioning Station | Standard Operation | TM4 | UCx #10 | helium pressure test on TM4 HS water line at CS. | Helium pressure test on TM4 HS water line
at CS is finished. 80psi helium no leak. |
|
732
|
Monday, August 11, 2014, 14:30 |
David Wang | ITE | Standard Operation | TM4 | UCx #10 | TM4 is connected in ITE. | TM4 is connected in ITE. All ITE
turbo pumps are started. I will check the
pumping down process tomorrow morning. Everything |
|
751
|
Tuesday, September 23, 2014, 11:49 |
David Wang | ITE | Standard Operation | TM4 | UCx #10 | TM4 has been disconnected in ITE. | TM4 has been disconnected and moved to
SHC from ITE. ITE was vented with argon before
move. |
|
157
|
Thursday, August 02, 2012, 07:48 |
David Wang | Conditioning Station | Standard Operation | TM1 | UCx | TM1 UCx target heat shield helium pressure check is done. | Connected leak detector to TM1 and CS vacuum
system. The vacuum readings on TM1 and
CS:PNG4 3.6 xE-6 Torr, IG1 1.1xE-6torr, IG4(diagnostic |
|
162
|
Tuesday, August 14, 2012, 14:27 |
David Wang | ITW | Standard Operation | TM1 | UCx | TM1connection in ITW | Connected TM1 in ITW,started 6 turbo pumps,
and finished TM1 water interlock check .
Every thing is good so far. |
|
176
|
Wednesday, September 12, 2012, 11:59 |
David Wang | ITW | Standard Operation | TM1 | UCx | TM1 disconnected in ITW | I removed 5 shielding blocks from ITW to
block storage area, and disconnected TM1
in ITW. After UCx run, the radioactive |
|