Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
RH-ISAC
Not logged in
List
Message ID:
1024
Entry time:
Wednesday, July 29, 2015, 06:24
Author:
David Wang
Category:
Conditioning Station
Type:
Standard Operation
Module:
TM4
Target/Number:
UCx 13
Subject:
Stopped the CS and TM4 pumps and vent with argon.
Dan and I stopped the CS and TM4 pumps. We are venting the CS with argon for UCX13 target.
ELOG V2.9.2-2455