  ID Date Author Category Type Module Target/Numberdown Subject Text Attachments
  1779   Friday, September 07, 2018, 10:55 David WangITEStandard OperationTM4UCx 24#TM4 has been connected to ITE/ ChecklistTM4 has been connected to ITE on Sep 04th.
See attachment  for checklist.
 TM4_UCx_24#__connection_check_list.pdf 
  1797   Tuesday, October 02, 2018, 09:49 David WangITEStandard OperationTM4UCx 24#TM4 was disconnected in ITE.TM4 was disconnected in ITE yesterday.
See attachment for checklist.
 TM2_UCx_24#_disconnection_in_ITE..pdf 
  1018   Monday, July 27, 2015, 17:03 David WangConditioning StationStandard OperationTM4UCx 13UCx13 and TM4 under vacuum at CS.I connected the CS  vacuum system 
to TM4. The CS and TM4 turbo pumps are started.
Everything is good so far. The HS line will
  
  1019   Tuesday, July 28, 2015, 10:12 David WangConditioning StationStandard OperationTM4UCx 13Helium pressure test on TM4 HS line at CSI did the helium pressure test on TM4 HS
line at CS. Applied 70 psi helium  2
minutes. base leak rate0.0x E-9 atm.cc/sec. 
  
  1024   Wednesday, July 29, 2015, 06:24 David WangConditioning StationStandard OperationTM4UCx 13Stopped the CS and TM4 pumps and vent with argon.Dan and I stopped the CS and TM4 pumps.
We are venting the CS with argon for UCX13
target.
  
  1068   Tuesday, September 15, 2015, 08:24 David WangSouth Hot-CellRepairTM1UCx 13Leak check on TM1 window circuit soldering stems in service cap.I did a leak check on TM1 window circuit 
2 soldering  stems in service cap.The
round side panel was opened for the job.
  
  1146   Tuesday, December 01, 2015, 14:30 David WangITEStandard OperationTM4UCx 13TM4 has been connected in ITETM4 has been connected in ITE. All turbo-pumps
are started. Everything is good so far.
  
  671   Monday, June 02, 2014, 11:25 chad fisherSouth Hot-CellStandard OperationTM1UCx #9UCx #9 InstalledUCx #9 has been installed.   
  2742   Tuesday, January 07, 2025, 12:05 David WangITEStandard OperationTM3UCx #47ITE primary and secondary vacuum vessel leak check for 2025 shut downITE primary and secondary vacuum vessel
leak check for 2025 shut down have been done.
No leak.  The TM3 waterlines helium
  
  2307   Thursday, February 17, 2022, 13:24 David WangSpent Target VaultMaintenance UCx #34Repackage of UCx #34in NHC.UCX34# in pail 258(Vault lot 7C) has been
repacked today. It is an investigation to
find a possible leak source of radioactive
  
  61   Tuesday, November 22, 2011, 15:07 Bevan MossConditioning StationStandard OperationTM1UCx #3HV testing High Voltage (HV) testing was completed
on TM1 today. Vacuum was very good 1.9 x
10^-7 T in the service cap, 3.2 x 10^-7 in
 UCx_#3_HV_testing.JPG 
  20   Thursday, August 18, 2011, 13:12 chad fisherSouth Hot-CellStandard OperationTM1UCx #2UCx #2 InstallationUCx #2 has been installed onto TM1.
Installation went well except the
left leg got bent slightly sometime between
  
  726   Thursday, August 07, 2014, 13:58 David WangSouth Hot-CellStandard OperationTM4UCx #10Leak check on TM4 HS water line with new UCX target.Isaac and I leak checked TM4 HS line with
new UCX target. The leak detector base LR
0.0xE-9 atm.cc/sec, base pressure0.0xE-4torr.
  
  727   Thursday, August 07, 2014, 17:07 David WangConditioning StationStandard OperationTM4UCx #10TM4 is connected in CS.TM4 is connected at CS. All turbo pumps
are started. The pumping down is good so
far.
  
  728   Friday, August 08, 2014, 08:47 David WangConditioning StationStandard OperationTM4UCx #10helium pressure test on TM4 HS water line at CS.Helium pressure test on TM4 HS water line
at CS is finished. 80psi helium no leak. 
 015.JPG012.JPG016.JPG014.JPG 
  732   Monday, August 11, 2014, 14:30 David WangITEStandard OperationTM4UCx #10TM4 is connected in ITE.TM4 is connected in ITE. All ITE 
turbo pumps are started. I will check the
pumping down process tomorrow morning. Everything
  
  751   Tuesday, September 23, 2014, 11:49 David WangITEStandard OperationTM4UCx #10TM4 has been disconnected in ITE.TM4 has been disconnected and moved to
SHC from ITE. ITE was vented with argon before
move.
  
  157   Thursday, August 02, 2012, 07:48 David WangConditioning StationStandard OperationTM1UCxTM1 UCx target heat shield helium pressure check is done.Connected leak detector to TM1 and CS vacuum
system. The vacuum readings   on TM1 and
CS:PNG4 3.6 xE-6 Torr, IG1 1.1xE-6torr, IG4(diagnostic
  
  162   Tuesday, August 14, 2012, 14:27 David WangITWStandard OperationTM1UCxTM1connection in ITWConnected TM1 in ITW,started 6 turbo pumps,
and finished TM1 water interlock check .
Every thing is good so far.
  
  176   Wednesday, September 12, 2012, 11:59 David WangITWStandard OperationTM1UCxTM1 disconnected in ITWI removed 5 shielding blocks from ITW to
block storage area, and disconnected TM1
in ITW. After UCx run,  the radioactive
  