  2395   Tuesday, November 29, 2022, 11:03 Adam NewsomeITEStandard OperationTM4C#4TM4 Move - TCS to ITETM4 was moved from the Conditioning Station
to the East Target Station with C#4. 
  
  2394   Thursday, November 24, 2022, 11:32 Adam NewsomeSpent Target VaultStandard OperationTM4C#4C#4 Spent Target Moved to Storage VaultC#4 spent target was moved to the storage
vault, in pail 277. Dose rate at approximately
1 m when leaving the hot cell was 164 mSv/h.
 Target_Index_2022-11-24.pdf 
  2393   Wednesday, November 23, 2022, 12:10 Adam NewsomeConditioning StationStandard OperationTM4UCx#41TM4 Move - NHC to TCSTM4 was moved from the North Hot Cell to
the Target Conditioning Station with UCx#41.
  
  2392   Wednesday, November 23, 2022, 11:27 Frank SongNorth Hot-CellStandard OperationTM4UCx#41electric and leak check after new target installed an electric check and leak check
done on NHC, TM4 with new target UCx#41 is
ready moving to TCS.
 TM4_with_UCx#41_electric_and_leak_check_on_NHC.png 
  2391   Tuesday, November 22, 2022, 14:53 Carla BabcockNorth Hot-CellMaintenanceTM4 Multipin connector alignment pin on TM4 module looseThe pin on TM4 has become loose again,
making it very difficult to remove the multipin
connector with the last target, C#4. For
  
  2390   Tuesday, November 22, 2022, 12:41 Frank SongNorth Hot-CellStandard OperationTM4C#4electrical check TM4 with C#4 is checked on NHC
right after moving from ITE.
 TM4_with_C#4_electrical_check_right_after_moving_to_NHC.png 
  2389   Tuesday, November 22, 2022, 10:37 Adam NewsomeNorth Hot-CellStandard OperationTM4 TM4 Move - ITE to NHCTM4 was moved from ITE to NHC with C#4.
  
  2388   Tuesday, November 22, 2022, 09:44 Frank SongITEStandard OperationTM4C#4module disconnectionTM4 with C#4 was disconnected in ITE  TM4_with_C#4_disconnected_in_ITE.png 
  2387   Tuesday, November 15, 2022, 13:33 Frank SongITWStandard OperationTM2UCx#40Module Connection TM2 with UCx#40 is connected in ITW.  TM2_with_UCx#40_connection_in_ITW.png 
  2386   Thursday, November 03, 2022, 16:41 Carla BabcockNorth Hot-CellStandard Operation UCx#39Post irradiation inspection UCx#39Did the PIE on UCx#39-IGLIS on Thursday
Nov. 2 2022, couple pictures uploaded to
docushare. Did not remove the target, just
  
  2385   Thursday, November 03, 2022, 13:15 David WangConditioning StationStandard OperationTM2UCx#40HS line helium pressure test. TM4 with UCx#40at TCS.Helium 70 psi. tested 5minutes at base
leak rate 0.9 xE09 atm.cc/sec on HS line. 
No leak.
  
  2384   Thursday, November 03, 2022, 10:08 Travis CaveSpent Target VaultStandard Operation UC#39Spent Target Move The spent UC#39 target (pail #276)
was removed from the north hot cell and place
in the spent target vault (spot 4B) it was
 Target_Index_2022-11-03.pdf 
  2383   Wednesday, November 02, 2022, 11:11 Frank SongNorth Hot-CellStandard OperationTM2UCx#40electrical checkan electrical check was done on NHC, TM2
with new target UCx40 is ready moving to
TCS.
 TM2_with_UCx40_electrical_check_on_NHC.png 
  2382   Tuesday, November 01, 2022, 12:40 Frank SongNorth Hot-CellStandard OperationTM2UCx#39electrical check TM2 with spent target UCx#39 had
an electric check in NHC.
After UCx 39# target was removed
 electical_check_for_TM2_with_spent_target_UCx39_on_NHC.png 
  2381   Tuesday, November 01, 2022, 12:37 Frank SongITWStandard OperationTM2UCx#39disconnection TM2 with spent target UCx#39 was
disconnected in ITW then moved to NHC.
 TM2_with_UCx39_disconnection_in_ITW.png 
  2380   Wednesday, October 19, 2022, 12:04 Carla BabcockConditioning StationRepair  TCS:TBHT taken as replacement for ITE:TBHTDuring the last ITE run with the SiC#44
target, the ITE:TBHT controls card was fried
twice. The first time we put in our spare,
  
  2379   Wednesday, October 19, 2022, 12:00 Carla BabcockNorth Hot-CellStandard OperationTM4SiC#44PIE on SiC#44Conducted PIE on SiC#44, which failed online.
It had a cathode short, a target short and
an anode short by the time we called the
 SiC44_PIE_20221012_150145.jpgSiC44_PIE_20221012.jpgSiC44_PIE_20221012_161755.jpg 
  2378   Monday, October 17, 2022, 08:07 David WangITE/ITWRepairTM4 A small leak on target station secondaryvacuum back up line by ITH MP1S.
    

       
            A  small leak in target station
  
  2377   Thursday, October 13, 2022, 09:32 Travis CaveSpent Target VaultStandard Operation SiC#44Spent Target Move Spent target move done. The SiC#44
was moved from the north hot cell to the
spent target vault. It was placed in pail#275
 Target_Index_2022-10-13.pdf 
  2376   Tuesday, October 11, 2022, 12:39 Frank SongITEStandard OperationTM4C#4Module Connection TM4 with Target C#4 was connected
in ITE.
 TM4_with_C#4_connection_in_ITE.png 