2395
|
Tuesday, November 29, 2022, 11:03 |
Adam Newsome | ITE | Standard Operation | TM4 | C#4 | TM4 Move - TCS to ITE | TM4 was moved from the Conditioning Station
to the East Target Station with C#4. |
|
|
2394
|
Thursday, November 24, 2022, 11:32 |
Adam Newsome | Spent Target Vault | Standard Operation | TM4 | C#4 | C#4 Spent Target Moved to Storage Vault | C#4 spent target was moved to the storage
vault, in pail 277. Dose rate at approximately
1 m when leaving the hot cell was 164 mSv/h. |
|
|
2393
|
Wednesday, November 23, 2022, 12:10 |
Adam Newsome | Conditioning Station | Standard Operation | TM4 | UCx#41 | TM4 Move - NHC to TCS | TM4 was moved from the North Hot Cell to
the Target Conditioning Station with UCx#41.
|
|
|
2392
|
Wednesday, November 23, 2022, 11:27 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | UCx#41 | electric and leak check after new target installed | an electric check and leak check
done on NHC, TM4 with new target UCx#41 is
ready moving to TCS. |
|
|
2391
|
Tuesday, November 22, 2022, 14:53 |
Carla Babcock | North Hot-Cell | Maintenance | TM4 | | Multipin connector alignment pin on TM4 module loose | The pin on TM4 has become loose again,
making it very difficult to remove the multipin
connector with the last target, C#4. For |
|
|
2390
|
Tuesday, November 22, 2022, 12:41 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | C#4 | electrical check | TM4 with C#4 is checked on NHC
right after moving from ITE. |
|
|
2389
|
Tuesday, November 22, 2022, 10:37 |
Adam Newsome | North Hot-Cell | Standard Operation | TM4 | | TM4 Move - ITE to NHC | TM4 was moved from ITE to NHC with C#4.
|
|
|
2388
|
Tuesday, November 22, 2022, 09:44 |
Frank Song | ITE | Standard Operation | TM4 | C#4 | module disconnection | TM4 with C#4 was disconnected in ITE |
|
|
2387
|
Tuesday, November 15, 2022, 13:33 |
Frank Song | ITW | Standard Operation | TM2 | UCx#40 | Module Connection | TM2 with UCx#40 is connected in ITW. |
|
|
2386
|
Thursday, November 03, 2022, 16:41 |
Carla Babcock | North Hot-Cell | Standard Operation | | UCx#39 | Post irradiation inspection UCx#39 | Did the PIE on UCx#39-IGLIS on Thursday
Nov. 2 2022, couple pictures uploaded to
docushare. Did not remove the target, just |
|
|
2385
|
Thursday, November 03, 2022, 13:15 |
David Wang | Conditioning Station | Standard Operation | TM2 | UCx#40 | HS line helium pressure test. TM4 with UCx#40at TCS. | Helium 70 psi. tested 5minutes at base
leak rate 0.9 xE09 atm.cc/sec on HS line.
No leak. |
|
|
2384
|
Thursday, November 03, 2022, 10:08 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#39 | Spent Target Move | The spent UC#39 target (pail #276)
was removed from the north hot cell and place
in the spent target vault (spot 4B) it was |
|
|
2383
|
Wednesday, November 02, 2022, 11:11 |
Frank Song | North Hot-Cell | Standard Operation | TM2 | UCx#40 | electrical check | an electrical check was done on NHC, TM2
with new target UCx40 is ready moving to
TCS. |
|
|
2382
|
Tuesday, November 01, 2022, 12:40 |
Frank Song | North Hot-Cell | Standard Operation | TM2 | UCx#39 | electrical check | TM2 with spent target UCx#39 had
an electric check in NHC.
After UCx 39# target was removed |
|
|
2381
|
Tuesday, November 01, 2022, 12:37 |
Frank Song | ITW | Standard Operation | TM2 | UCx#39 | disconnection | TM2 with spent target UCx#39 was
disconnected in ITW then moved to NHC. |
|
|
2380
|
Wednesday, October 19, 2022, 12:04 |
Carla Babcock | Conditioning Station | Repair | | | TCS:TBHT taken as replacement for ITE:TBHT | During the last ITE run with the SiC#44
target, the ITE:TBHT controls card was fried
twice. The first time we put in our spare, |
|
|
2379
|
Wednesday, October 19, 2022, 12:00 |
Carla Babcock | North Hot-Cell | Standard Operation | TM4 | SiC#44 | PIE on SiC#44 | Conducted PIE on SiC#44, which failed online.
It had a cathode short, a target short and
an anode short by the time we called the |
|
|
2378
|
Monday, October 17, 2022, 08:07 |
David Wang | ITE/ITW | Repair | TM4 | | A small leak on target station secondaryvacuum back up line by ITH MP1S. |
A small leak in target station |
|
|
2377
|
Thursday, October 13, 2022, 09:32 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#44 | Spent Target Move | Spent target move done. The SiC#44
was moved from the north hot cell to the
spent target vault. It was placed in pail#275 |
|
|
2376
|
Tuesday, October 11, 2022, 12:39 |
Frank Song | ITE | Standard Operation | TM4 | C#4 | Module Connection | TM4 with Target C#4 was connected
in ITE. |
|