Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2434     Entry time: Friday, April 28, 2023, 21:39
Author: David Wang 
Category: Conditioning Station 
Type: Standard Operation 
Module:  
Target/Number:  
Subject: TCS cooling water system was started and tested this Wednesday 

TCS cooling water system was started and tested this Wednesday. Chiller compressor 2 and 3 was in operation cycle twice without issue. TCS:TK2 was refilled to 28 inches. Water system works fine. system was switched off after test.

ELOG V2.9.2-2455