2788
|
Friday, April 04, 2025, 09:35 |
David Wang | Crane | Development | | | spent target pail and its lifting jigs load test | Adam and I did spent target pail
and its lifting jigs load test this morning.
The load for full pail test is 263 lbs and |
|
|
2789
|
Friday, April 11, 2025, 13:34 |
chad fisher | North Hot-Cell | Repair | | | remote end 9342 installed | On March 27 remote end 9342 was installed
on the west position (right hand as viewed
by operator) and arm 9764 removed and moved |
|
|
2790
|
Friday, April 11, 2025, 13:46 |
chad fisher | North Hot-Cell | Repair | | | Remote end 9**4 repair | Tong cable on remote arm 9**4 has be relocated
onto its pulleys and tong opening adjusted
at the tong cable drum by changing the position |
|
|
2791
|
Wednesday, April 23, 2025, 14:08 |
Adam Newsome | North Hot-Cell | Standard Operation | TM4 | | TM4 Module Move | TM4 was moved from Safe Module Parking
to the North Hot Cell today. |
|
|
2795
|
Thursday, April 24, 2025, 13:42 |
David Wang | Conditioning Station | Standard Operation | | | Refilled TCS:TK2 from 11" to 28.8 " | Refilled TCS:TK2 from 11" to 28.8
". |
|
|
2796
|
Friday, April 25, 2025, 14:30 |
Adam Newsome | Facilities | Standard Operation | | | Safety Walkaround complete - ISAC Hot Cells, Target Hall | A safety walkaround was completed for the
ISAC Hot Cells and Target Hall Areas.
The resulting spreadsheet can be |
|
|
2798
|
Friday, May 02, 2025, 10:16 |
Aaron Tam | North Hot-Cell | Maintenance | | | NHC Window Oil Fill | Findings
During April 2025 safety
walk ID: 2796 , it was noted that the |
12x |
|
2799
|
Monday, May 05, 2025, 09:18 |
chad fisher | North Hot-Cell | Maintenance | | | Manipulator Remote End Replacement 9352 with 9764 | Remote end 9352 replaced with end 9764
due to signs of an issue with the tong cable
(tong opening excessively large and slack |
|
|
2803
|
Monday, May 12, 2025, 09:17 |
David Wang | Facilities | Standard Operation | | | BL2A MAA ASU Test | MCR Travis Curucz , Frank, and I finished
BL2A MAA ASU test per document 154779. everything
works fine. Travis kept the test document. |
|
|
2804
|
Tuesday, May 13, 2025, 13:12 |
Frank Song | MAA | Repair | | | Swap out the target hall alpha CAM. |
|
|
|
2805
|
Tuesday, May 13, 2025, 13:13 |
Frank Song | MAA | Repair | | | Swap out the target hall alpha CAM. | AlphaCAM has been replaced and tested by
RPG in MAA target hall. (per Document-154779)
WorkPermit # I2025-05-13-3 |
|
|
2808
|
Friday, May 23, 2025, 13:12 |
chad fisher | Manipulator Maintenance | Repair | | | SHC West manipulator tong cable replacement | Broken tong cable on West manipulator (serial
#8106) replaced.
Wrist joint with broken cable was |
|
|
2809
|
Friday, June 06, 2025, 08:36 |
David Wang | Crane | Maintenance | | | TH crane main hoist B starting delay issue appears again. | TH crane main hoist B starting delay issue
appears again this Thursday. It is about
1 minute waiting time after power on the |
|
|
2810
|
Tuesday, June 10, 2025, 11:50 |
Frank Song | 5 Shielding Blocks | Standard Operation | | | shielding blocks transfer | 5 shielding blocks on ITE have been transferred
to ITW. |
|
|
2811
|
Friday, June 13, 2025, 09:32 |
chad fisher | South Hot-Cell | Maintenance | | | Quarter century clean up | Thursday June 12th two 55 gal drums filled
with waste from the SHC. 1 drum with metal
waste, 1 with mostly air hoses. Pre-filter |
|
|
2819
|
Friday, June 20, 2025, 10:38 |
Jason Zhang | Spent Target Vault | Maintenance | | | Annual Inspection of Main and Mini Storage Vaults | The
annual inspection of the main storage vault
and mini storage vault was performed on 2025-06-20. |
|
|
2820
|
Friday, June 20, 2025, 10:46 |
Jason Zhang | Safe Module Parking | Maintenance | | | Annual electrical and mechanical inspection of Safe Module Parking | An annual electrical
and mechanical inspection was performed on |
|
|
2822
|
Tuesday, June 24, 2025, 16:08 |
Adam Newsome | Pail Handling Tool | Standard Operation | | | Pail Handling Tool - Inspection | The pail handling tool which is used to
move 5 gallon pails around the target hall
was inspected by A. Newsome. The main tool |
 |
|
2823
|
Tuesday, June 24, 2025, 16:14 |
Adam Newsome | Pail Handling Tool | Standard Operation | | | Empty Pail Lifter - Inspection | The empty pail lifter which is used to
move empty 5 gallon pails around the target
hall was inspected by A. Newsome. The tool |
|
|
2824
|
Thursday, June 26, 2025, 13:17 |
Frank Song | 5 Shielding Blocks | Standard Operation | | | shielding blocks transfer | Five shielding blocks have been transferred
from ITW to ITE, MAA is secured for beam
on. |
|