Thursday June 12th two 55 gal drums filled with waste from the SHC. 1 drum with metal waste, 1 with mostly air hoses. Pre-filter also changed and scissor table hydraulic lines inspected. looks ok.
Thursday, June 6 two 55 gal drums of waste were also removed. 1 of metal and one of compess. (plastic, tank suits etc) |