Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2824     Entry time: Thursday, June 26, 2025, 13:17
Author: Frank Song 
Category: 5 Shielding Blocks 
Type: Standard Operation 
Module:  
Target/Number:  
Subject: shielding blocks transfer 

 Five shielding blocks have been transferred from ITW to ITE, MAA is secured for beam on.

ELOG V2.9.2-2455