Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2810     Entry time: Tuesday, June 10, 2025, 11:50
Author: Frank Song 
Category: 5 Shielding Blocks 
Type: Standard Operation 
Module:  
Target/Number:  
Subject: shielding blocks transfer 

5 shielding blocks on ITE have been transferred to ITW. 

ELOG V2.9.2-2455