Subject: Annual electrical and mechanical inspection of Safe Module Parking  

 An annual electrical and mechanical inspection was performed on the SMP on 2025-06-20. The following items were checked:

  • Check condition of wiring for physical/radiation/UV damage
    • OK, no signs of significant damage
  • Check for cable tray debris or damage
    • OK
  • Check inside control panel: components and wiring, labeling
    • Labeling intact, components in good condition
    • Misc. random wires pulled to check... OK
  • Check connectors for damage
    • All connectors OK
  • Check pendant for damage and verify labeling intact
    • Pendant OK
  • Lid open/close test
    • Lid was opened and close multiple times - smooth operation, no concern
    • Lid close logic was checked - OK
  • Vessel rotation and limit switch check
    • Both CW and CCW limits were checked, functioning
    • No concern on rotation - chain drive, rotary limit switch, and cable reel all functioning normally
  • Inspect tensioners
    • Done - OK
  • Visual inspection
    • All OK
  • Lid Bearings
    • Noticed a missing grease nipple so a new one was installed.
    • Applied grease to the bearings although it may not be necessary due to the movements allowed in the lid mechanism. 

Overall the inspection was successful.

Photos can be found in G:\remote handling\Facilities and Projects\ISAC\Mini Storage Vault\Inspections