  2788   Friday, April 04, 2025, 09:35 David WangCraneDevelopment  spent target pail and its lifting jigs load test Adam and I did  spent target pail
and its lifting jigs load test this morning. 
The load for full pail test is 263 lbs and
  
  2789   Friday, April 11, 2025, 13:34 chad fisherNorth Hot-CellRepair  remote end 9342 installedOn March 27 remote end 9342 was installed
on the west position (right hand as viewed
by operator) and arm 9764 removed and moved
  
  2790   Friday, April 11, 2025, 13:46 chad fisherNorth Hot-CellRepair  Remote end 9**4 repairTong cable on remote arm 9**4 has be relocated
onto its pulleys and tong opening adjusted
at the tong cable drum by changing the position
  
  2791   Wednesday, April 23, 2025, 14:08 Adam NewsomeNorth Hot-CellStandard OperationTM4 TM4 Module MoveTM4 was moved from Safe Module Parking
to the North Hot Cell today. 
  
  2795   Thursday, April 24, 2025, 13:42 David WangConditioning StationStandard Operation  Refilled TCS:TK2 from 11" to 28.8 "Refilled TCS:TK2 from 11" to 28.8
".
  
  2796   Friday, April 25, 2025, 14:30 Adam NewsomeFacilitiesStandard Operation   Safety Walkaround complete - ISAC Hot Cells, Target Hall A safety walkaround was completed for the
ISAC Hot Cells and Target Hall Areas.
The resulting spreadsheet can be
  
  2798   Friday, May 02, 2025, 10:16 Aaron TamNorth Hot-CellMaintenance  NHC Window Oil FillFindings

    During April 2025 safety
walk ID: 2796 , it was noted that the
 12x 
  2799   Monday, May 05, 2025, 09:18 chad fisherNorth Hot-CellMaintenance  Manipulator Remote End Replacement 9352 with 9764Remote end 9352 replaced with end 9764
due to signs of an issue with the tong cable
(tong opening excessively large and slack
  
  2803   Monday, May 12, 2025, 09:17 David WangFacilitiesStandard Operation  BL2A MAA ASU TestMCR Travis Curucz , Frank, and I finished
BL2A MAA ASU test per document 154779. everything
works fine. Travis kept  the test document.
  
  2804   Tuesday, May 13, 2025, 13:12 Frank SongMAARepair  Swap out the target hall alpha CAM. 
 
  
  2805   Tuesday, May 13, 2025, 13:13 Frank SongMAARepair  Swap out the target hall alpha CAM.AlphaCAM has been replaced and tested by
RPG in MAA target hall. (per Document-154779)
WorkPermit # I2025-05-13-3
  
  2808   Friday, May 23, 2025, 13:12 chad fisherManipulator MaintenanceRepair  SHC West manipulator tong cable replacementBroken tong cable on West manipulator (serial
#8106) replaced.
Wrist joint with broken cable was
  
  2809   Friday, June 06, 2025, 08:36 David WangCraneMaintenance  TH crane main hoist B starting delay issue appears again.TH crane main hoist B starting delay issue
appears again this Thursday. It is about
1 minute waiting time after power on the
  
  2810   Tuesday, June 10, 2025, 11:50 Frank Song5 Shielding BlocksStandard Operation  shielding blocks transfer5 shielding blocks on ITE have been transferred
to ITW. 
  
  2811   Friday, June 13, 2025, 09:32 chad fisherSouth Hot-CellMaintenance  Quarter century clean upThursday June 12th two 55 gal drums filled
with waste from the SHC. 1 drum with metal
waste, 1 with mostly air hoses. Pre-filter
  
  2819   Friday, June 20, 2025, 10:38 Jason ZhangSpent Target VaultMaintenance  Annual Inspection of Main and Mini Storage VaultsThe
annual inspection of the main storage vault
and mini storage vault was performed on 2025-06-20.
 Fray.jpg 
  2820   Friday, June 20, 2025, 10:46 Jason ZhangSafe Module ParkingMaintenance  Annual electrical and mechanical inspection of Safe Module Parking  An annual electrical
and mechanical inspection was performed on
  
  2822   Tuesday, June 24, 2025, 16:08 Adam NewsomePail Handling ToolStandard Operation  Pail Handling Tool - InspectionThe pail handling tool which is used to
move 5 gallon pails around   the target hall
was inspected by A. Newsome.  The main tool
 PXL_20250624_223603391.MP.jpgPXL_20250624_224037019.MP.jpg 
  2823   Tuesday, June 24, 2025, 16:14 Adam NewsomePail Handling ToolStandard Operation  Empty Pail Lifter - InspectionThe empty pail lifter which is used to
move empty 5 gallon pails around    the target
hall was inspected by A. Newsome. The tool
  
  2824   Thursday, June 26, 2025, 13:17 Frank Song5 Shielding BlocksStandard Operation  shielding blocks transfer Five shielding blocks have been transferred
from ITW to ITE, MAA is secured for beam
on.
  