Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC, Page 141 of 141  Not logged in ELOG logo
ID Date Author Category Type Moduledown Target/Number Subject
  2805   Tuesday, May 13, 2025, 13:13 Frank SongMAARepair  Swap out the target hall alpha CAM.

AlphaCAM has been replaced and tested by RPG in MAA target hall. (per Document-154779)

WorkPermit # I2025-05-13-3

ELOG V2.9.2-2455