  2564   Wednesday, April 17, 2024, 11:58 David WangITE/ITWMaintenance  ITH:MP1S pump inside lubricant was changed today. ITH:MP1S pump inside lubricant was changed
today. old lubricant is dirty with dark color.
they are stored in sealed waste oil jug and
  
  2563   Tuesday, April 16, 2024, 12:33 David WangConditioning StationStandard Operation  test TCS water system chillers stage in/out. Monday and Tuesday, I started TCS water
system and enabled the TCS chillers auto
stage in/out. I saw chiller 2 in/out three
  
  2562   Thursday, April 11, 2024, 06:27 David WangSouth Hot-CellDevelopmentTM3 TM3 new source tray was transferred into SHC on this Tuesday. TM3 new source tray was transferred into
SHC on this Tuesday. one hook arm of transfer
jig is very close to optic tray tube when
  
  2561   Thursday, April 11, 2024, 06:07 David WangSouth Hot-CellStandard OperationTM3 Tm3 was moved from silo to SHC yesterday.Tm3 was moved from silo to SHC yesterday.
the move is smooth. 
  
  2560   Monday, April 08, 2024, 09:29 David WangCoolingStandard Operation  HALCW system general inspection. water are supplied to both ITE and ITW.
I did a general inspection on HALCW system.
Two small leaks on 2" shut off valves
  
  2559   Thursday, April 04, 2024, 13:10 David WangCoolingMaintenance  high active water refurbishment, reinstallation, and test operation. both high active pumps ITC:MP1 and MP2
are refurbished by RH group Maico and Peter.
Pumps have been installed back to system
  
  2558   Wednesday, April 03, 2024, 10:48 chad fisherSouth Hot-CellMaintenance  SE Manipulator wrist swapOn April 2, 2024 the wrist on the SE manipulator
of the SHC (Serial # 7986) was swapped with
a rebuild unit originally from SW position
 original_but_incorrect_cable_routing_E-HD_manipulators.JPG 
  2557   Thursday, March 28, 2024, 09:26 David WangSouth Hot-CellStandard OperationTM3 Tm3 has been moved from SHC to silo.Tm3 has been moved  from SHC to silo.
The move is smooth. 
  
  2556   Wednesday, March 27, 2024, 09:52 David WangITEStandard Operation  ITE entrance module top and module flange o-ing to tank have been leak checked.ITE entrance module top and module flange
o-ing to tank have been leak checked. no
leak at 0.0xe-9 atm.cc/sec. things are double
  
  2555   Wednesday, March 27, 2024, 09:49 David WangSouth Hot-CellStandard OperationTM3 Tm3 has been moved to SHC from silo.Tm3 has been moved to SHC from silo. the
move is smooth. 
  
  2554   Monday, March 25, 2024, 10:55 David WangITEStandard Operation  ITE entrance module has been reconnected in ITE pit. ITE entrance module has been reconnected
in ITE pit per document 190510. 
  
  2553   Monday, March 25, 2024, 10:53 David WangITERepair  ITE entrance module has been moved from TCS to ITE.ITE entrance module has been moved from
TCS to ITE. The move is smooth. 
  
  2552   Thursday, March 21, 2024, 11:35 Ferran Boix PamiesITEDevelopment  Wiring of new thermocouple PLC module Thursday, March 21, 2024, 11:33 Three
channels are available now for thermocouple
readouts from the Target multipin. Wiring
  
  2551   Friday, March 15, 2024, 10:04 Adam NewsomeSouth Hot-CellStandard OperationTM3 TM3 Move - SHC to NE SiloTM3 was moved from SHC to NE silo. Cable
tray was recently installed. 
  
  2550   Thursday, March 14, 2024, 14:54 David WangITEMaintenance  ITE entrance module has been moved from ITE pit to TCS. ITE entrance module has been moved from
ITE pit to TCS. The move is smooth.ITE entrance
module top tank flange and o ring slot are
  
  2549   Wednesday, March 13, 2024, 11:12 Keith C NgAssembly/Bench TestRepairTM3 optics tray for tm3Alignment notes attached for the optics
tray for the refurbished tm3 with the new
service and source tray.
 20240313_optics_tray_alignment_notes.pdf 
  2548   Friday, February 23, 2024, 06:36 David WangITEMaintenance  ITE entrance module has been disconnected.ITE entrance module has been disconnected
per document 190510. Its a preparation job
for next month module moving out to SHC.
  
  2547   Friday, February 16, 2024, 11:48 David WangCoolingMaintenance  high active water transferr to holding tank100 liters of high active water from HALCW
system( mostly from s-tank and pipe lines
closing to pumps) are transferred to holding
  
  2546   Friday, February 16, 2024, 10:57 Adam NewsomeSpent Target VaultStandard Operation  F-308 flask loading - three flasks loadedToday (2024-02-16), three flasks were loaded
in preparation for  shipment with the following
targets: UCx#39, UCx#41 and C#3.
 Target_Index_2024-02-16.xlsm 
  2545   Thursday, February 15, 2024, 17:40 Carla BabcockITEStandard Operation  ITE annual HV testingITE was set up for HV tests - this time
the module plug was not in so the BIAS and
EE had to be bypassed. NOTE: ITE:BIASPLC
  