Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2556     Entry time: Wednesday, March 27, 2024, 09:52
Author: David Wang 
Category: ITE 
Type: Standard Operation 
Module:  
Target/Number:  
Subject: ITE entrance module top and module flange o-ing to tank have been leak checked. 

ITE entrance module top and module flange o-ing to tank have been leak checked. no leak at 0.0xe-9 atm.cc/sec. things are double checked.

ELOG V2.9.2-2455