Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2568     Entry time: Friday, April 26, 2024, 08:56
Author: David Wang 
Category: Conditioning Station 
Type: Development 
Module: TM3 
Target/Number:  
Subject: TM3 module top helium spray leak test.  

TM3 module top helium spray leak test was done yesterday.  No leak on TM3 module top @ LD base leak rate 0.0 x E-9 atm.cc/sec.

ELOG V2.9.2-2455