  2759   Thursday, January 30, 2025, 07:07 David WangCraneStandard Operation  target hall crane annual inspection.Tom Kauss finished TH crane annual inspection
yesterday. The crane woks  fine. Tom  has
this inspection record in his file. The crane
  
  2760   Thursday, January 30, 2025, 07:13 David WangCraneStandard Operation  inspection of target module lifting frames ITA0494-1997-01 and ITA1994-1997-02Tom  Gauss inspected  two target module
lifting frames ITA0494-1997-01   and  ITA0494-1997-02
yesterday. He certified the use of these
  
  2761   Thursday, January 30, 2025, 07:17 David WangCraneStandard Operation  inspection of target hall crane below hook attachment pins and plates ITA6550-01.Tom Kauss inspected target hall crane below
hook attachment pins and    plates ITA6550-01
yesterday. He certified the use of these
  
  2762   Monday, February 03, 2025, 13:04 David WangSafe Module ParkingMaintenance  ITW/ITW 24VDC electrical connectors for TP BVs MRO.ITW/ITW 24VDC electrical connectors for
TP BVs MRO has been done.  
  
  2763   Monday, February 03, 2025, 13:10 David WangCoolingStandard Operation  HALCW pump ITC:MP1 has been started. HALCW pump ITC:MP1 has been started. water
are supplied to both ITE and ITW system.
all water signals for individual circuits
  
  2764   Tuesday, February 04, 2025, 11:50 Alexander ShkuratoffITWStandard Operation  ITW HV bias test without module (Work permit I2025-02-03-2)Tuesday, February 04, 2025, 10:15

    Started voltage ramp up.
Using 250 V increments.

 Tuesday,
  
  2765   Wednesday, February 05, 2025, 13:46 Alexander ShkuratoffITEStandard Operation  ITE HV bias test without module (Work permit I2025-02-03-2) Wednesday, February 05, 2025, 12:20

    Ed has the voltage already
up to 1000 V. Starting further ramp up in
  
  2767   Tuesday, February 11, 2025, 10:36 chad fisherSouth Hot-CellRepairTM2 Conductor Block Insulator ReplacementCeramic conductor blocks ITD0053 and ITD0054
were replaced on TM2. Initially, only ITD0053
was to be replaced but after removing it
 Image_(12).jpegImage_(13).jpegImage_(14).jpeg 
  2768   Friday, February 14, 2025, 10:43 David WangITW/ITEStandard Operation  target pit CAD filter replacement in TH. Plant Group Gabril.T organized a target
pit CAD filter replacement and testing yesterday.
My group helped on this job.  small
  
  2770   Friday, February 14, 2025, 11:35 David WangConditioning StationStandard OperationTM2 TM2 TP1/TP2 and TCS TP1S have been started at TCS.TM2 TP1/TP2 and TCS:TP1S have been started
at TCS. The starting time and operation of
turbo pumps are ok. TM2 had been stored in
  
  2775   Thursday, February 20, 2025, 11:29 chad fisherSouth Hot-CellStandard Operation  Field CheckAfter removing the previously found extraction
electrode and other suspect components the
field at the manipulator tongs (in front
  