Wednesday, December 04, 2024, 09:00, David Wang, Facilities, Standard Operation, TM2, , all water lines on TM2 have been purged.
|
all water lines on TM2 have been purged. Refilled them(except HS ) with 60psi nitrogen for module silo storage before next year using. |
Wednesday, December 04, 2024, 10:40, Adam Newsome, South Hot-Cell, Standard Operation, TM2, , TM2 move - SHC to silo
|
TM2 was remotely moved from the South Hot Cell to SW Silo. Reading at SHC = 89.8 mSv/h. The move was smooth. |
Wednesday, December 18, 2024, 12:18, Adam Newsome, Spent Target Vault, Standard Operation, , , Five Pails Transferred from Main Vault to Mini Vault
|
Five pails were transferred from main vault to mini vault. Note that there was already one pail in the mini vault, so at present there are six pails
staged for packaging into F-308s.
Nb#10, Pail 295, Tray 4A |
Wednesday, December 18, 2024, 14:17, Adam Newsome, Pail Handling Tool, Maintenance, , , Pail Handling Tool - Inspection
|
An informal inspection of the main Pail Handling Tool was performed today as the final one for the year. Note that the main formal annual inspection
was performed June 18, 2024 for this year.
The attachment to this e-log serves as a record of all inspections for this tool throughout 2024. |
Friday, January 03, 2025, 09:59, Adam Newsome, Facilities, Standard Operation, , , Safety Walkaround complete - ISAC Hot Cells, Target Hall
|
A safety walkaround was completed for the ISAC Hot Cells and Target Hall Areas.
The resulting spreadsheet can be found on DocuShare as Document-242733.
Main deficiencies identified: |
Thursday, January 09, 2025, 11:08, David Wang, Facilities, Maintenance, , , ITH:MP1 is deteriorating by watching on ITH:CG1 and CG2 readings
|
ITH:MP1 is deteriorating by watching on ITH:CG1 and CG2 readings and investigation in pit. A fault 17644 has been issued. this pump will be replaced
in March when general fielding in vacuum pit is reasonable for the job. |
Monday, January 20, 2025, 11:33, Adam Newsome, Waste Package/Ship, Standard Operation, , , F-308 flask loading - six flasks loaded
|
Today (2025-01-20), six flasks were loaded in preparation for shipment with the following targets: C#4, TiC#5, Ta#64,Ta#62, Nb#10, SiC#44
Some of the pails (256, 273, 279, 277) required replacement of the wire rope cable with new style, 30 ft length, as requested by CNL. A lifting
label was also applied to these pails. Some of the pails (295, 298) already had the appropriate cable and lifter label. |
Tuesday, January 21, 2025, 10:46, David Wang, ITE/ITW, Standard Operation, , , ITW/ITE pit general annual cleaning up.
|
ITW/ITE pit general annual cleaning up were done. all concrete floor and TM equipment surface are vacuum cleaned. HV cage inside and blue nylon
insulators were wiped by paper. |
Wednesday, January 22, 2025, 10:29, Frank Song, Faraday Cage, Maintenance, , , Annual clean up for ITE/ITW Faraday cages
|
David and I cleaned both cages in ISAC1 electric room, all done. |
|