ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
Text |
|
2193
|
Tuesday, March 02, 2021, 08:12 |
David Wang | Conditioning Station | Standard Operation | | | TCS leak check. | TCS leak check: TCS IG1S1.6 XE- 6 torr.
LD 0.0XE-9atm.cc/sec.We used a long
pole to spray helium to TCS vacuum seals |
|
2438
|
Thursday, May 04, 2023, 07:14 |
David Wang | Safe Module Parking | Standard Operation | TM4 | | SMP vacuum pumpimg down is stopped. | SMP vacuum pumping down is stopped.
SMP and TM4 venting to atmosphere will be
started soon. |
|
2733
|
Thursday, December 05, 2024, 11:43 |
Aaron Tam | South Hot-Cell | Standard Operation | | Ta#68 | Pail loading - Ta#68 & Others into Pail#300 | December 5, 2024 - Aaron Tam w/ help from
Chad, Peter and Adam at the Crane
Hot Cell Prep: |
|
2174
|
Thursday, December 24, 2020, 09:00 |
Matthew Gareau | North Hot-Cell | Development | | | NHC USB connection | |
|
97
|
Wednesday, May 02, 2012, 11:27 |
David Wang | ITW | Standard Operation | TM1 | | ITW is ready for taking proton beam. | I moved 5 shielding blocks from ITE
to ITW . I checked all ITW water
signals strength and frequency in electrical |
|
2288
|
Tuesday, January 11, 2022, 11:50 |
David Wang | ITW | Maintenance | | | ITW Exit module 1 side sqaure panel O-ing seal replacement. | Frank and I replaced ITW Exit module 1
side square service panel o-ring seal. Also,
The target module pit top flange o-ring seal |
|
656
|
Monday, May 05, 2014, 13:11 |
David Wang | ITE | Repair | TM3 | | ITE Entrance module has been disconnected. | ITE entrance module has been disconnected
and the lifting yoke is installed for module
move. See attached pictures. |
|
2634
|
Friday, July 05, 2024, 14:13 |
Adam Newsome | Waste Package/Ship | Standard Operation | | | F-308 flask loading - five flasks loaded | Today (2024-07-05), five flasks were loaded
in preparation for shipment with the following
targets: SiC#43 (Pail 272), SiC#44 (Pail |
|
2637
|
Wednesday, July 10, 2024, 09:55 |
Adam Newsome | Safe Module Parking | Maintenance | | | Annual electrical and mechanical inspection of Safe Module Parking | An annual electrical and mechanical inspection
was performed on the SMP today by Adam
Newsome, Travis Cave, Riley Sykes, Maico |
|
2617
|
Tuesday, June 18, 2024, 15:04 |
Adam Newsome | Spent Target Vault | Maintenance | | | Annual Inspection of Main and Mini Storage Vaults | The annual inspection of the main storage
vault will be skipped this year since extensive
inspection and testing was performed during |
|
2452
|
Tuesday, June 06, 2023, 15:10 |
Antoniette Yap | Spent Target Vault | Maintenance | | | Annual Inspection of Main and Mini Storage Vaults | The annual inspection of the mini-storage
vault and main storage vault was completed
June 23, 2023. The following items were checked: |
|
2317
|
Thursday, April 28, 2022, 08:16 |
David Wang | ITW | Standard Operation | TM2 | | Annual ITW water signal interlocks check . | Annual ITW water signal interlocks check
was done with TM2 in ITW. Water
signal interlocks on all water circuits related |
|
1638
|
Tuesday, October 10, 2017, 10:38 |
David Wang | ITW | Standard Operation | | | 5 shielding blocks have been transferred from ITE to ITW . | ITW is configured to take proton beam. |
|
2619
|
Wednesday, June 19, 2024, 08:10 |
David Wang | Waste Package/Ship | Development | | | 5 gallon spent target pail, spent target lifting long pole and hook assembly load test | 5 gallon spent target pail, lifting
long pole and hook assembly load test was
done by Rupan, Keyur ,and David. Load |
|
783
|
Thursday, November 06, 2014, 08:55 |
David Wang | ITW | Repair | TM1 | ThO#1 | primary vacuum back up pressureITH CG1 ,CG2,CG4A were high. | I found primary vacuum back up pressure
ITH CG1, CG2, and CG4A were unusually high
this morning. They should be about 10 -20 |
|
2098
|
Thursday, June 04, 2020, 10:40 |
David Wang | Conditioning Station | Maintenance | | | Three manual valves are closed on TCS water system | Three manual valves are closed on TCS water
system return line in experimental hall.
See attachments. It is for TCS TK2 water |
|
873
|
Wednesday, March 25, 2015, 14:34 |
David Wang | Conditioning Station | Standard Operation | TM4 | Ta#45 | TM4 and CS turbo- pumps are started . | I connected TM4 and CS vacuum system after
TM4 move. CS roughing pump was started first
this morning. Later, Anders, Bill and I started |
|
1316
|
Thursday, August 11, 2016, 10:37 |
David Wang | Conditioning Station | Repair | TM3 | | TM3 service tray cover plate ITA2108 has been removed. | Requested by Aurelia, and approved by Friedhelm,
TM3 service tray cover plate ITA2108 has
been remove out of the module. The plated |
|
695
|
Friday, June 27, 2014, 10:16 |
David Wang | Conditioning Station | Standard Operation | TM3 | | TM3 HS water lines helium pressure test. at CS | TM3 HS water line helium pressure test
is done at CS. 70 psi helium , 3 minutes.Base
LR 0.0xE-9 atm.cc/sec, base pressure 0.0xE-4 |
|
1185
|
Wednesday, March 30, 2016, 15:49 |
David Wang | Assembly/Bench Test | Repair | TM2 | | TM2 Helium spray leak check on solder stems inside service cap on the top of SW silo. | On each water circuit in side the service
cap, there are 4 soldering stems which two
of them are inside blue nylon insulator and |
7x |