Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 683     Entry time: Tuesday, June 17, 2014, 10:46
Author: David Wang 
Category: ITW 
Type: Standard Operation 
Module: TM1 
Target/Number: UC#9 
Subject: 5 Shielding blocks have been transferred from ITE to ITW. 

5 shielding blocks have been transferred from ITE to ITW. ITW is configured to take proton beam. Argon venting system for ITW is ready also.

ELOG V2.9.2-2455