  2460   Tuesday, June 20, 2023, 12:37 Adam NewsomeAssembly/Bench TestDevelopment  Modifications to wire ropes for pails within existing F-308sBased on a request from CNL (attached),
modifications were made to the wire ropes
protruding through the tops of F-308s to
 6x 
  2462   Wednesday, June 21, 2023, 14:39 Adam NewsomeSafe Module ParkingMaintenance  Annual electrical and mechanical inspection of Safe Module ParkingAn annual electrical and mechanical inspection
was performed on the  SMP today by Adam Newsome,
Travis Cave, Eric Lahe, Maico Dalla Valle,
 PXL_20230621_210144119.MP.jpgPXL_20230621_210546559.jpgPXL_20230621_210146892.jpg 
  2468   Friday, July 28, 2023, 10:09 Adam NewsomeSpent Target VaultMaintenance  Main Storage Vault: Bearing LubricationBearings for the main storage vault door
were lubricated on 2023-07-28. It is unknown
when this was last done. It is suggested
  
  2469   Friday, July 28, 2023, 10:21 Adam NewsomeSpent Target VaultMaintenance  Mini Storage Vault: Bearing LubricationThe bearings on the mini storage vault
were lubricated. It is suspected that this
has never been done. It is suggested that
 PXL_20230728_162515733.jpg 
  2470   Tuesday, August 01, 2023, 09:06 Adam NewsomeCraneDevelopment  Measuring Tape and Camera Removed from Target Hall CraneIn an effort to clean up the camera installation
on top of the ISAC target hall crane to resolve
a fault, the position measuring tape and
  
  2487   Friday, September 01, 2023, 10:36 Adam NewsomeSpent Target VaultStandard Operation UCx#42Spent Target MoveUCx #42 moved from North Hot Cell to Storage
Vault in Pail #282. Placed in slot 6B. Tray
6 is now full. Pail measured at 34.9 mSv/h
 Target_Index_2023-09-01.xlsm 
  2489   Thursday, September 14, 2023, 11:16 Adam NewsomeSpent Target VaultDevelopment Ta #58Investigation of Pail 211 (Ta #58)Upon attempting to lower Pail 211 into
their tile hole, CNL encountered issues with
the pail getting stuck. They shipped the
 Report_on_Inspection_of_Pail_211_on_2023-09-14.pdf 
  2501   Friday, November 17, 2023, 11:12 Adam NewsomeSpent Target VaultStandard Operation  Four pails moved from main storage to mini storageThe following four pails were moved from
the main storage vault to the mini storage
vault, to stage for shipping in Jan. 2024:
 Target_Index_2023-11-17.pdf 
  2502   Friday, November 17, 2023, 11:28 Adam NewsomeSpent Target VaultMaintenance  Storage vault: issue observed with door openingDuring operation today, it was observed
that the main vault door had issues opening..
typically when the door was around 80-90%
 PXL_20231117_200245076.jpgPXL_20231124_210005281.jpg 
  2504   Wednesday, November 22, 2023, 12:24 Adam NewsomeSpent Target VaultStandard Operation Ta#65Spent Target MoveThe spent Ta#65 target was removed from
the south hot cell and placed  in the spent
target vault. It was placed in pail #284
  
  2505   Thursday, November 23, 2023, 11:15 Adam NewsomeCraneRepair  Target Hall Crane: CW/CCW rotation mechanism failure [tripped breaker]It is reported that the crane's hook rotation
is not working currently. It was working
yesterday (Nov 22). Investigation to follow,
  
  2507   Tuesday, November 28, 2023, 12:58 Adam NewsomeSouth Hot-CellStandard OperationTM3 TM3 Move - Silo to SHCTM3 was moved from the Silo to South Hot
Cell. 
  
  2509   Wednesday, December 13, 2023, 11:42 Adam NewsomeSouth Hot-CellStandard OperationTM3 TM3 Move - TCS TO SHCTM3 has been moved from the target conditioning
station to the south hot cell. 
  
  2510   Friday, December 15, 2023, 11:07 Adam NewsomeConditioning StationStandard OperationTM3 TM3 Move - SHC to TCSTM3 was moved from the SHC to the TCS (no
target installed). 
  
  2511   Friday, December 15, 2023, 11:31 Adam NewsomeSpent Target VaultStandard Operation Ta#58Pail repack, transfer to mini-storage vaultPail 211 which contained Ta#58 spent target
was repackaged into Pail 286 in the South
Hot Cell.
 Target_Index_2023-12-15.pdf 
  2516   Monday, January 08, 2024, 14:47 Adam NewsomeSouth Hot-CellStandard OperationTM2 TM2 Move - ITW to SHCTM2 was moved from ITW to the South Hot
Cell with Ta#66 target. 
  
  2517   Tuesday, January 09, 2024, 16:10 Adam NewsomeSouth Hot-CellStandard OperationTM2 TM2 Move - SHC to SiloTM2 was moved with no target attached from
the South Hot Cell to a silo. 
  
  2540   Friday, February 09, 2024, 12:52 Adam NewsomeSpent Target VaultStandard Operation  F-308 flask loading - five flasks loadedToday (2024-02-09), five flasks were loaded
in preparation for shipment with the following
targets: SiC#41, SiC#42, Nb#9, UC#36, Ta#58.
 Target_Index_2024-02-09.xlsm 
  2542   Wednesday, February 14, 2024, 11:32 Adam NewsomeSpent Target VaultStandard Operation UCx#43Spent Target MoveSpent target UCx#43 (pail 289) was moved
from the South Hot Cell to the Storage Vault,
placed in location 2A. Dose rate at 1m was
 Target_Index_2024-02-14.xlsm 
  2543   Wednesday, February 14, 2024, 11:34 Adam NewsomeSpent Target VaultStandard Operation Misc.Three pails moved from main vault to mini vaultIn preparation for F-308 loading, three
pails were moved from the main storage vault
to the mini storage vault. The following
 Target_Index_2024-02-14.xlsm 