Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2009     Entry time: Tuesday, October 22, 2019, 11:19
Author: Adam Newsome 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM4 
Target/Number: UC# 28 
Subject: TM4 Move 

TM4 with UC# 28 target has been moved from ITW to the South Hot Cell. Shield plug installed in ITW.

ELOG V2.9.2-2455